Sub-Metering for Business Premises: Meter Types, Costs and Recharging Tenants
Updated 23 October 2026 · Renewable Energy for Businesses
Want to cut what your site uses and pays for energy?
Request a quoteWhat is a sub-meter, and what is it for?
GOV.UK defines sub-metering as equipment that measures electricity consumption for specific buildings, production lines, processes, activities or equipment within a site. It sits behind the supplier's meter, and the supply itself is still identified by the numbers in the MPAN guide. It answers a narrower question than the bill does. The Carbon Trust calls metering energy use a fundamental action for all organisations, regardless of size or expertise.
A sub-meter has one of two jobs. The first is understanding: finding which plant, floor or process uses what. The monitoring guide covers what to measure and why. The second is billing, where a landlord or site operator charges someone else for what they used. The two jobs carry different legal tests, which is why this guide treats hardware and recharging together. Heat metered through a shared system is a separate subject, covered in the communal heating metering guide.
Which sub-meter types are there?
The sources divide the field by purpose and approval status rather than by gadget.
| Option | What the sources say | Can it bill a tenant? |
|---|---|---|
| Approved kWh meter | GOV.UK says any meter used for billing, by a supplier or a landlord, must be of an approved design. Newer designs are approved under the Measuring Instruments Regulations 2016 (MIR) | Yes, if fully approved. Type approval alone (Module B) is not enough for landlord-tenant billing |
| CT-operated meter | Elexon notes that metering systems can include measurement transformers such as current transformers (CTs), and that their ratios are what let the meter record the correct energy flow | Same test: the meter must be approved and the CT ratio correct and commissioned |
| Sensors, loggers and data tools | The Carbon Trust counts tools that gather data from energy meters or sub-meters, and software to report it, as digital technologies for energy management | Not unless the product carries approval markings |
| Monitoring software | The Carbon Trust describes automatic monitoring and targeting systems as gathering and collating energy consumption data and reporting or displaying the findings | Depends on the meters underneath it |
To check approval, look at the meter. GOV.UK says an MIR approved meter shows the UKCA or CE mark and an M marking with the year of manufacture, and that a meter without those markings is not MIR approved.
Larger supplies differ. GOV.UK says the MIR does not apply to electricity meters where the maximum supplied exceeds 100 kilowatts and the meter measures half-hourly. Those are approved by OPSS under national legislation and must also meet Balancing and Settlement Code requirements, so a landlord with a large sub-metered supply should ask the meter provider which regime applies.
This guide found no definition of a "check meter" in the Ofgem, Elexon or GOV.UK pages it searched. If a quote uses the term, ask whether the device is an approved billing meter or a monitoring meter, and what it will be compared against.
Is a sub-meter worth it?
CIBSE says good metering yields general and project-specific insights into energy use, enabling better energy management and benchmarking. Whether one more meter pays depends on four things:
- Size. Does the load take enough of the site's electricity to matter?
- Doubt. Is its share a guess today?
- Action. Could the answer change a decision, such as a control, a repair or a replacement?
- Billing or evidence. Does someone need a measured figure to charge a tenant or support an application?
For example, in a 2,000 square metre warehouse with one incomer and a cold store on its own distribution board, a meter on that board turns "refrigeration seems high" into a measured share of the site's use. A second meter on a lightly used office floor may tell the owner little.
Evidence is a live reason. GOV.UK's British Industrial Competitiveness Scheme guidance, updated 12 October 2026, says applicants who have sub-metering or electricity monitoring data should submit it when working out the share of grid electricity used to make eligible products, and should otherwise give an estimate and rationale. The application window runs from 1 October to 30 November 2026. Read the guidance for eligibility before assuming it applies.
Who can install a sub-meter?
The Electricity at Work Regulations 1989 do not name a trade, but regulation 16 says nobody should do work needing technical knowledge or experience to prevent danger unless they have it. Regulation 14 restricts work on or near live conductors where danger may arise. Fitting a meter or CTs in a live distribution board can involve both, so use a competent electrician and ask how the work will be isolated.
If the meter will bill a tenant, GOV.UK adds that primary and secondary meters used for billing must be of an approved pattern or construction and installed in an approved manner. Ask for the commissioning record. Elexon says accurate transformer ratios are essential to commissioning, and CIBSE's 2026 TM39 lists commissioning procedure and load-testing of electricity meters among its topics.
What does a sub-meter cost?
No official or standards-body page checked publishes a price, so this guide gives none. Cost depends on the number of circuits, whether CTs are needed, how data leaves the meter, the software and the commissioning. CIBSE TM39 treats accuracy, placement and communications as selection issues, which are also the items that move a quote. Ask for an itemised price covering:
- the meters, with their approval markings;
- CTs and cabling, if used;
- data communications and any software subscription;
- commissioning and testing, and who holds the records;
- how data can be exported if the provider changes.
Compare quotes on that basis. CIBSE also advises setting a meter strategy first, and the energy management page shows where metering sits in a wider plan.
What can a landlord recharge tenants?
Start with the meter: it must be an approved one. After that, Ofgem's maximum resale price is the rule to know. Its guidance says the maximum price at which gas or electricity may be resold is the same as the price paid by the reseller, including any standing charges. Ofgem's more recent page describes the cap as stopping resale for more than the reseller paid when the energy is used in people's homes.
For business tenants, the Ofgem pages checked do not set a cap. They describe the rule for homes, and Ofgem's call for input, published on 9 October 2025 and closed on 5 December 2025, lists non-domestic customers among the specific areas it is examining. No outcome appeared on the page checked. So this guide states no recharge ceiling for commercial tenants. Check Ofgem's current resale pages and the lease before billing at more than cost, and treat billing at the price paid as the benchmark Ofgem uses for homes.
CIBSE's TM39 includes a section on tenant billing for those who want the practice side. What a lease says about recharges and service charges is a legal question outside this guide. Readers who want a view of how metering fits a site can send an enquiry through the form on the energy management page.
Sources and last checked
Checked on 22 October 2026. Ofgem's resale review was open to responses until 5 December 2025 and no outcome was found, so Ofgem's current pages are the authority if they disagree with this one.
- GOV.UK, National regulation: gas and electricity meters and MID approved gas and electricity meters
- GOV.UK, British Industrial Competitiveness Scheme: guidance for applicants (updated 12 October 2026)
- CIBSE, TM39 Building Metering and Monitoring (2026) (published May 2026)
- Ofgem, The resale of gas and electricity: guidance on maximum resale price (13 October 2005) and Reselling gas and electricity: Maximum Resale Price direction (9 October 2025)
- Elexon, Current and Voltage Transformer ratios
- legislation.gov.uk, Electricity at Work Regulations 1989, regulation 16 and regulation 14
- Carbon Trust, Digital technologies for energy management and buyers' guide
- GOV.UK, smart meters guide for the public sector (updated 22 June 2023)
Guides on this topic
- DALI Lighting Control Systems: What They Do and When a Business Needs One
- Meter Operators and Data Collectors: Who Runs a Half-Hourly Meter and Its Data
- NABERS UK and CIBSE TM54: Predicting and Rating an Office's Real Energy Use
- BREEAM Explained for Building Owners: Ratings, Schemes and Energy Credits
- CT Metering for Business: How a CT Meter Works and When You Have One
Common questions
Can I use a sub-meter reading to challenge my supplier's bill?
Not directly. GOV.UK says that if you think your meter is inaccurate you should contact your supplier, and that the legislation allows the meter to be independently tested. A sub-meter reading can show a discrepancy, but the first step is the supplier.
Is a sub-meter the same as a smart meter?
No. A smart meter is the supplier's meter, and GOV.UK says it can send up to half-hourly consumption data to the supplier. A sub-meter measures part of a site behind that meter, for one building, process or machine, and its data goes to you or your software.
What is a check meter?
This guide found no definition of the term in the Ofgem, Elexon or GOV.UK pages it searched. If a quote offers one, ask whether it is an approved billing meter or a monitoring device, what it will be compared with, and whether its readings could be used to bill a tenant.
Do larger supplies need different sub-meters?
Possibly. GOV.UK says the Measuring Instruments Regulations do not cover electricity meters where the maximum supplied exceeds 100 kilowatts and measurement is half-hourly. Those are approved by OPSS under national legislation and must also meet Balancing and Settlement Code requirements, so ask the meter provider which route applies.