What is the difference between whole-current and CT metering?
A whole-current meter carries every amp the premises draws, and Electricity North West says the majority of residential and small business properties are metered this way. Larger supplies use current transformers (CTs) on the incoming conductors, and GOV.UK's smart meter consultation describes a CT meter as one that uses a current transformer as part of the mechanism for measuring the electric current.
The CT gives the meter a small current in proportion to the one in the cable. Elexon, which administers the Balancing and Settlement Code, calls the transformer ratios instrumental in letting a meter record the true primary energy flow. A meter with the wrong ratio can be perfectly accurate about the wrong number.
The switch-over is the network operator's call. SSEN says it can install a CT metered supply for a load over 69kVA, and Electricity North West says CT metering is generally used for three-phase supplies above 69 kW. The 2002 supply regulations declare a low voltage supply at 230 volts between phase and neutral, and 3 × 230 V × 100 A is 69 kVA, so the line sits at about 100 A per phase. Two Elexon Codes of Practice use the same line, for low voltage circuits fused at 100 amps or less per phase. The network operator guide shows whose rules apply, and the three-phase supply guide explains capacity.
| Question | Whole-current metering | CT metering |
|---|---|---|
| How the current reaches the meter | All of it passes through the meter | CTs pass a proportional current; the ratio scales it back up |
| Usual supply size | Most small business premises | Generally three-phase, above about 69 kVA |
| Microbusiness meter type | Suppliers must take all reasonable steps to fit SMETS2+ | Must be an advanced meter |
| Capacity charge | Not part of Ofgem's description | Ofgem describes a maximum import capacity charge |
| Ongoing cost | Lower (Northern Powergrid) | Higher (Northern Powergrid) |
How do the CT ratio and the multiplier turn a small current into kWh?
A CT ratio is written as primary current over secondary current. For example, a 400/5 CT turns 400 A in the cable into 5 A at the meter, a ratio of 80, so 2.5 A at the meter means 200 A of real load.
The ratio is a formal record. The BSC obliges network operators and meter operators to enter CT ratios only from an agreed list, and the ratios travel between industry parties in meter technical details data flows. Ratios can also be programmed into the meter, and Elexon lists incorrect ratios programmed into a meter among the causes of bad data.
Then comes the multiplier. Elexon notes that half-hourly meter reads are converted by multipliers to show actual volumes, and that some meters carry three. So a figure copied from the display may need multiplying before it matches a bill. Ask the supplier for both figures on record, and have the meter operator check them on site.
Which Elexon Codes of Practice apply to CT metering?
Settlement metering is expected to meet its Code of Practice, and a registrant can apply to Elexon for a dispensation where, for financial or practical reasons, the equipment will not or does not comply.
| Code | What it covers | Why it matters for a CT-metered business |
|---|---|---|
| Code of Practice 10 | Energy via low voltage circuits | Includes CT-operated meters since June 2009. Elexon's change paper called it the less expensive choice where demand should stay below the 100 kW mandatory half-hourly threshold |
| Code of Practice 5 | Maximum demand up to and including 1MW | The more expensive choice, meeting mandatory half-hourly requirements if demand passes 100 kW |
| Code of Practice 3 | Circuits not exceeding 10 MVA | Larger circuits |
| Code of Practice 4 | Calibration, testing and commissioning | The site tests when CT metering is commissioned |
Elexon's glossary gives a half-hourly CT site below 100kW its own measurement class, E, against G for a non-domestic whole-current site and C above 100kW.
CP1553, implemented on 30 June 2022, set out to tighten the requirements for meters and CTs, as class 0.5 CTs are tested only down to 5% of rated measuring current. CP1586, implemented on 29 February 2024, addressed CT ratios not appropriately selected for a circuit's maximum current, which Elexon says can make current measurement inaccurate.
Half-hourly settlement
Elexon's modification P432, implemented on 15 April 2024, set explicit half-hourly settlement obligations for CT advanced meters. Existing ones still settling non-half-hourly had to move by milestone M14, which the P432 page put at October 2026. The half-hourly settlement guide covers the wider timetable.
Who installs, commissions and maintains a CT meter?
- The customer appoints the supplier, which UK Power Networks says arranges the installation of any electricity meters.
- The supplier employs agents to read the meter, collect and aggregate data, and install and maintain the meter, Ofgem says, though a business can appoint its own.
- The meter operator, one of those agents, installs, commissions, tests and maintains meters, in Elexon's definition.
- The network operator provides the connection, and SSEN pairs a CT metered supply over 69kVA with a connection agreement. Where a building network operator runs the internal network, SSEN makes it responsible for any CT metering over 69kVA.
Commissioning ties these together. Elexon calls it a series of site tests and checks on metering equipment, in which accurate measurement of transformer ratios is essential, and its risk register shows that network operators and meter operators can both fail to complete it correctly. After any CT meter work, ask the supplier to confirm commissioning was completed and who holds the record.
What goes wrong with CT metering, and how does it show on a bill?
Elexon's risk register for supplier metering lists CTs installed incorrectly, meters configured wrongly, commissioning done badly or not at all, and a new half-hourly meter operator not told that commissioning was unfinished. Any of these can put erroneous or estimated data into settlement.
| Fault | Effect on readings (illustration) | What to look for |
|---|---|---|
| Wrong ratio or multiplier in the meter or the records | Every reading out by the same factor: a record of 200/5 with 400/5 CTs fitted halves recorded use | Bills that differ from your own half-hourly data or sub-meter totals by a steady proportion |
| A CT failed or wired incorrectly on one phase | On an evenly balanced three-phase load, losing one phase leaves about two-thirds recorded | A drop in recorded use with no change in how the site runs |
| Commissioning missed, or not handed over at a change of meter operator | Either fault above can go unnoticed | A shift in bills after a meter exchange or agent change |
Under-recording hurts later. Once a fault is found the supplier may recalculate past use, and the guide to back-billing rules covers how far back it can bill a business. Over-recording means paying for energy the site never used.
Start with the supplier. GOV.UK says anyone who believes their meter is inaccurate should always contact the supplier, and that the legislation allows the meter to be independently tested, though you may have to pay the supplier for organising it if the meter is found to be working correctly. The pages checked do not say how that test treats CTs, so ask what will be checked and bring your own half-hourly data.
Are the CTs on a monitoring system the same as the supplier's?
No. Elexon counts current transformers as part of the metering system that settles the supply. A monitoring or sub-metering system may use CTs of its own on circuits behind that meter, and the Carbon Trust counts sensors, alongside software, as part of digital energy management tools.
Billing changes the test. GOV.UK says any meter used for billing, whether by a licensed supplier or a landlord, must be of an approved design, so a CT-based sub-meter used to recharge a tenant needs an approved meter as well as a correct ratio. The sub-metering guide covers tenant recharging. Leave the supplier's metering CTs alone: monitoring belongs on the customer's side of the meter, fitted by a competent electrician. The energy management page puts metering in a site-wide plan.
Who pays for what with CT metering?
No official or network operator page checked publishes a price for CT metering, so this guide sets out who pays instead.
- The connection. CT metering comes through the network operator's connection offer. On UK Power Networks' large low voltage connections, providing the space for CT metering shown on its drawing is the customer's responsibility.
- The meter and agents. The supplier arranges the meter and its agents unless the business appoints its own, and Ofgem suggests looking for half-hourly qualified ones. Ask how metering and data services are charged in the contract.
- Running costs. Northern Powergrid says CT metered connections incur higher ongoing costs than whole-current metering. Ofgem describes a maximum import capacity charge for CT-metered businesses and suggests contacting the network operator if it looks too high.
- The meter class. Elexon's 2009 change paper called a CoP10 meter less expensive than a CoP5 one, so expected demand shapes the choice.
Readers weighing metering, monitoring and demand reduction for a site can send an enquiry through the form on the energy management page.
A CT-metered site is a larger supply, and its half-hourly data is what a solar or battery proposal should be sized from: the commercial solar page covers sizing, and quote requests sent through the form on this page get a reply by email.
Sources
All sources checked 28 October 2026.
- Elexon: Current and Voltage Transformer ratios, Metering, Codes of Practice, Metering Dispensation consultation (28 April 2022), CP1273, CP1553, CP1586, CP0807, P432 (updated 15 April 2024), glossary Measurement Class(es) and Meter Operator Agent, and 003 SVA Risk
- Ofgem: Moving to half-hourly energy reads: a guide for businesses (15 June 2021)
- GOV.UK: Non-domestic smart meter rollout post-2025 consultation (updated 1 September 2026), National regulation: gas and electricity meters and MID approved gas and electricity meters (6 November 2025), Electricity meters: independent testing of accuracy (2 July 2018)
- legislation.gov.uk: Electricity Safety, Quality and Continuity Regulations 2002, regulation 27
- Network operators: SSEN Building Network Operator, Electricity North West Connecting a single EV charging point, Northern Powergrid Get connected, UK Power Networks 3.10 CT metering (April 2024) and 3.26 Appoint an Electricity Supplier (December 2015)
- Carbon Trust: Digital technologies for energy management
Common questions
How can I tell if my business has a CT meter?
Ask the supplier or the meter operator, because a CT-metered supply has a CT ratio recorded in its meter technical details. Supply size is a clue: SSEN and Electricity North West generally use CT metering above about 69 kVA. A maximum import capacity charge on the bill is another sign, since Ofgem's guide describes that charge for businesses with a CT meter.
Can a CT meter be a smart meter?
For a microbusiness, the supplier licence rule GOV.UK describes requires all reasonable steps to fit SMETS2+ meters, except where the meter is a current transformer meter, which must be an advanced meter. Either way, ask the supplier what half-hourly data it holds for the meter and how to get a copy.
What is a maximum import capacity charge?
Ofgem's guide for businesses says the network operator charges a maximum import capacity (MIC) charge for the space it has reserved for a site on its network, and it describes this for businesses with a CT meter. It relates to reserved capacity rather than the energy the meter records. If the figure looks too high, Ofgem suggests contacting the distribution network operator.
Who corrects a wrong CT ratio?
Start with the supplier, which appoints the meter operator. Elexon's rules oblige network operators and meter operators to enter CT ratios only from an agreed list, and accurate ratios are part of commissioning. Ask for the installed CTs to be checked against the record and for the record to be corrected if they differ, and keep your own half-hourly data and bills to show when readings changed.