What is BREEAM, and who runs it?

BREEAM is a sustainability assessment and certification scheme for buildings, operated in the UK by BRE Global. Defra's procurement page gives the full name, the Building Research Establishment's Environmental Assessment Method, and the scheme was launched in 1990.

Assessors trained and licensed by BRE gather the evidence and determine the rating, and BRE Global quality-assures the assessment before a certificate is issued. BRE Global is accredited by UKAS.

Its categories, as BREEAM's site lists them, are management, water, energy, transport, health and wellbeing, resources, resilience, land use and ecology, pollution, materials, waste and innovation. The UK New Construction 2018 manual scores nine categories, plus innovation credits.

Which BREEAM scheme suits an existing building?

  • New Construction: newly built assets, including a new extension to an existing structure. BRE's Version 7 FAQs say Version 7.1 is now the default for new registrations, with Version 6 and 2018 closed to them.
  • Refurbishment and Fit Out: two Version 7 standards. Refurbishment covers the fabric, structure, core services and overall asset performance; Fit Out covers occupier-led interior work such as layouts, finishes, furnishings and local services.
  • In-Use: buildings already operating, of any operational asset type, BRE says.
  • Others: Communities for masterplanning, Infrastructure, and UK New Construction Residential, previously known as HQM.

For an occupied office, shop or warehouse with no major works planned, In-Use fits. BRE's knowledge base says it rates performance at the time of certification, not commitments to improve, and that changes during a 3-year certification cycle can be reflected in an updated Version 6 certificate. The 2018 New Construction manual says a mostly-refurbishment project with a new-build extension may suit Refurbishment and Fit Out better.

What do the BREEAM rating bands and scores mean?

A BREEAM score is a weighted percentage: the share of credits won in each category is multiplied by that category's weighting, the results are added, and each innovation credit adds 1%. The rating is awarded only if every minimum standard for that level is also met, and the certificate shows it as stars.

BRE's benchmarks for projects assessed under the 2018 version of BREEAM UK New Construction (manual SD5078, Issue 3.1, 29 November 2024) are:

RatingScoreWhat BRE says it broadly represents
Outstanding85% or moreLess than the top 1% of UK new non-domestic buildings (innovator)
Excellent70% or moreTop 10% (best practice)
Very Good55% or moreTop 25% (advanced good practice)
Good45% or moreTop 50% (intermediate good practice)
Pass30% or moreTop 75% (standard good practice)
UnclassifiedBelow 30%Performance that does not comply with BREEAM

Most credits can be traded between categories, but minimum standards cannot, so missing one can leave a building a band lower, or Unclassified, whatever its score. Thresholds belong to the scheme version, so use the table in the manual the building is registered under; BRE gives professionals Version 7.1 manuals through its BREEAM Projects login and offers other project teams access. BREEAM In-Use adds an Acceptable band below Pass.

Which energy credits do metering, monitoring and renewables earn?

BRE says about half of BREEAM's credits target carbon and energy efficiency, and that BREEAM assigns carbon reductions to renewable electricity exported to the grid. The key issues in the 2018 UK New Construction manual are:

IssueCreditsWhat BRE asks for
Ene 01 Reduction of energy use and carbon emissions13An Energy Performance Ratio (EPR NC), plus credits for predicting operational energy through extra modelling at design and post-construction stage
Ene 02 Energy monitoring2Metering that assigns at least 90% of each fuel's estimated annual use to end uses, renewable or low carbon systems separately; a second credit for high energy load and tenancy areas
Ene 04 Low carbon design3Two for passive design; one for an energy specialist's low and zero carbon (LZC) feasibility study by the end of Concept Design, then specifying the local (on-site or near-site) technologies it recommends
Man 05 Aftercare3Includes 12 months of energy and water data and monthly reports comparing sub-metered energy with the prediction

Ene 03 and Ene 05 to Ene 08 cover external lighting, cold storage, transportation systems, laboratory systems and equipment.

  • The LZC credit rewards a process. The study should cover, as a minimum, annual energy generated and carbon saved, life cycle cost including payback, planning criteria such as land use and noise, export potential, grants and why other technologies were excluded. It is due by the end of Concept Design, so the technology choice comes early; the commercial buildings page explains how roof, demand and supply shape it.
  • Metering is a minimum standard. The first Ene 02 credit is required for Very Good and above, and buildings over 1,000 m² need an energy monitoring and management system to earn it. See the sub-metering guide for meter types and the energy monitoring guide for what to measure first.
  • Measured results weigh more. BRE's manual names poor monitoring as the largest single reason buildings use more energy than expected, and its Version 7.1 FAQs say energy credits now give more weight to predictive modelling and operational performance targets.

Not in itself. BREEAM is a certification scheme, not legislation, so it becomes compulsory for a project only when something else requires it.

Central government. Defra says the minimum Government Buying Standards are mandatory in central government, and that public sector bodies must achieve Excellent in new builds and at least Very Good in major refurbishments. The State of the Estate 2023-24 report sets the same levels for new-build and retrofit.

Check the adopted local plan and any planning conditions for the site before design starts.

How does an assessment work, and what drives the cost?

  1. Appoint a licensed assessor. BRE recommends doing so, with a BREEAM Advisory Professional, no later than RIBA Stage 1.
  2. Register the project.
  3. Design stage (optional): an interim rating.
  4. Post-construction stage: mandatory.
  5. BRE Global quality assurance, then certification.
  6. Post-occupancy stage: optional.

Outside In-Use and Infrastructure, a registration stays valid until 5 years after its scheme version expires; later submissions change the certificate format and fee. BRE's certification fees follow the fee sheet revision in force on the submission date, and this guide quotes no figures. The project drives most of the cost:

  • the rating targeted, as higher ratings carry more minimum standards;
  • the number of stages certified;
  • specialist work, such as the LZC study and Ene 01 modelling;
  • hardware, such as sub-meters and a monitoring system;
  • aftercare data collection;
  • timing, since BRE warns late advice can mean credits are missed or won only at extra cost or disruption.

Readers costing solar, storage or metering for a building with a BREEAM condition can send an enquiry through the form on the commercial buildings page.

How does BREEAM differ from an EPC, a DEC and the Net Zero Carbon Buildings Standard?

EPC. A building needs an EPC when it is built, sold or let, giving an A to G asset rating of the building itself, while BREEAM scores many categories.

DEC. A Display Energy Certificate rates actual energy use over the last 12 months. In England and Wales it applies to buildings over 250 m² occupied by a public authority and frequently visited by the public.

UK Net Zero Carbon Buildings Standard. BRE is among the organisations behind it and describes it as a way to prove that built assets align with the UK's carbon and energy budgets. The Net Zero Carbon Buildings Standard guide explains its requirements and verification.

Sources

All sources checked 28 October 2026.

Guides on this topic

Common questions

Can an occupied building get a BREEAM rating without building work?

Yes, through BREEAM In-Use, which BRE says covers all operational asset types. It rates performance at the time of certification, so planned improvements count only once they are made.

Do solar panels automatically earn BREEAM credits?

Not on their own under UK New Construction 2018. The Ene 04 low and zero carbon credit depends on an energy specialist's feasibility study by the end of Concept Design and on specifying what it recommends. Ene 02 also expects renewable or low carbon systems to be metered separately.

What does BREEAM Excellent need besides a 70% score?

Every minimum standard for Excellent. Under UK New Construction 2018 these include four Ene 01 credits, the first Ene 02 sub-metering credit and a Man 05 commissioning credit. Outstanding raises the Ene 01 minimum to six energy performance credits plus four prediction credits.