MPAN and MPRN Explained: Reading the Meter Numbers on a Business Bill
Updated 23 October 2026 · Renewable Energy for Businesses
Want to cut what your site uses and pays for energy?
Request a quoteWhat is an MPAN, and what is an MPRN?
An MPAN (Meter Point Administration Number) identifies an electricity supply point. An MPRN (Meter Point Reference Number) identifies a gas supply point in Great Britain. Northern Ireland differs: there, the MPRN is the electricity reference. Both numbers belong to the supply point rather than to the meter or the customer, so they stay with the premises when the tenant or the supplier changes.
The Energy Networks Association says the MPAN helps energy companies keep track of how much electricity you use and send the right bills to the right people. You will need details of the meter when you switch supplier, and network operators ask for the number on applications for work at existing premises, so it is worth knowing where to find them.
Where do I find my MPAN and MPRN on a business bill?
- MPAN. SSEN says MPANs can be found on energy bills. It is the long number shown for the electricity meter, usually set out in two lines. The bottom line is the 13-digit core, which SSEN describes as a unique reference identifying each electricity supply point.
- MPRN, gas. Xoserve says the MPRN has six to ten digits and appears on every gas bill in Britain. It is also called an M Number or Meter Number.
- MPRN, Northern Ireland electricity. NIE Networks describes the MPRN as a unique 11-digit number starting with 81 that identifies your address, found on your supplier's bill or the card the meter reader leaves.
The meter serial number is a different thing. It is printed on the meter itself. SSEN and NIE Networks both accept it, with the address, as an alternative when there is no bill.
What do the parts of an MPAN mean?
Industry changes in recent years have altered the top line of the number. The table shows both versions. The 13-digit core has not changed.
| Part | Where it sits | What it tells you |
|---|---|---|
| Profile class | First two digits of the full number, top line | The class the supplier has allocated for settlement. Classes 1 and 2 are domestic and 3 to 8 are non-domestic. |
| Meter timeswitch code (MTC) | Top line, older format | An older top-line item. The Retail Energy Code Company says it is not retained for migrated supplies and has no further use there. The standard settlement configuration takes its place in the top line. |
| Standard settlement configuration (SSC) | Top line, newer format | A four-character code relating to the physical meter set-up. It is mandatory for traditional meters and optional for smart ones. |
| Line loss factor class or DUoS tariff ID | Top line | The value is provided by the network operator, not the supplier. |
| Distributor ID | First two digits of the 13-digit core | Which network operator covers the premises. The network operator guide has the full table. |
| Supply point number | Remainder of the core | Makes the 13-digit core unique to the supply point. |
Under the newer format the top line is nine digits and the core stays at 13, giving a 22-digit supply number in place of the older 21. Newly created metering points since 24 September 2026 are created in the new settlement arrangements, so expect the newer layout on recent supplies and the older one on supplies not yet migrated. The half-hourly settlement guide explains what that migration means for a business.
What do profile classes mean for a business?
Elexon, which runs the settlement system, says the first two digits of the full MPAN indicate the profile class. Suppliers allocate their customers to a class. For a business the classes that matter are:
| Profile class | Description |
|---|---|
| 3 | Non-domestic unrestricted |
| 4 | Non-domestic Economy 7 |
| 5 | Non-domestic maximum demand, peak load factor under 20% |
| 6 | Non-domestic maximum demand, peak load factor 20% to 30% |
| 7 | Non-domestic maximum demand, peak load factor 30% to 40% |
| 8 | Non-domestic maximum demand, peak load factor over 40% |
Classes 5 to 8 are maximum demand customers, whose meters record the highest demand in a period. Peak load factor is the ratio, as a percentage, of the kWh consumed in a period to the kWh that would have been supplied had maximum demand been held throughout it. A flat, steady load has a high factor and a spiky one a low factor. Since 6 April 2014 every meter in classes 5 to 8 must be an advanced meter that can be read remotely and record half-hourly consumption, and half-hourly settlement has been mandatory for those classes since 1 April 2017 where capable metering is installed.
The Retail Energy Code Company says the profile class is only relevant for traditional meters, and under the new arrangements the class is mandatory for traditional meters but optional for advanced and smart ones. If the profile class on your bill does not look like any of the above, read it off the bill and ask the supplier what it means for the site.
Who issues the numbers, and how do I find a lost one?
Electricity. The network operator for the area issues the MPAN for a new supply. SSEN says that for a new property it sends the new MPAN once it has the postal address, and that independent operators (IDNOs) register and issue their own MPANs. The number sits on a national register, the Meter Point Administration Service, which holds the technical data. Electricity North West says that to ask for an MPAN you must be the owner or occupier of the property. Practical routes:
- Check recent bills, annual statements and the supplier's online account.
- Use the network operator's lookup. National Grid Electricity Distribution has a postcode checker for its own areas, and Electricity North West and SSEN each run a route for the same request. The guide to finding your operator shows which operator you need.
- If there is no bill because the premises is new to you, give the operator the full address and the meter serial number.
Gas. MPRNs are created through Xoserve's M Number Creation service. Xoserve also runs a Find my Supplier web service that returns the gas supplier, the MPRN and the gas transporter.
Northern Ireland. NIE Networks has a self-serve MPRN lookup, and the number is also on the meter reader's card.
When does a site need another MPAN?
Usually when it adds a separate metered point. SSEN says that if you already have an MPAN but need another without any work to the incoming supply cable, for example to install a microgeneration export meter, you request it through your electricity supplier. Where the work does involve the connection, the network operator issues the new MPAN as part of the job. A sub-meter behind the main meter is a different matter and is covered in the sub-metering guide.
When you plan solar or storage, the MPAN, the Distributor ID and the supply capacity are the first three details any adviser or contractor will ask for. You can send them with the site details as an enquiry through the quote form, and the cost guide sets out what a project involves.
Sources and last checked
Checked on 22 October 2026. Industry arrangements are changing during half-hourly settlement, so the operator's and Retail Energy Code Company's pages are the authority if they disagree with this one.
- SSEN, What is an MPAN?
- Energy Networks Association, Connecting electric vehicles and heat pumps to the networks
- Electricity North West, Metering Point Administration Service
- National Grid Electricity Distribution, What is my MPAN number?
- Elexon, Profiling and Implementation guidance for P272
- Retail Energy Code Company, EES Portal demo webinar recap (23 July 2025), Countdown to Market-Wide Half-Hourly Settlement webinar round-up, and the REC Portal pages on the Electricity Enquiry Service and SSC and TPR
- Xoserve, A to Z
- NIE Networks, How do I get my MPRN? and MPRN or meter serial number
- Ofgem, Switch your business energy supplier
Guides on this topic
- Meter Operators and Data Collectors: Who Runs a Half-Hourly Meter and Its Data
- How to Switch Business Energy Supplier: The Steps, the Paperwork and What Can Go Wrong
- Gas Meter Reading to kWh Calculator for Business Gas Bills
- What Is an IDNO? Independent Electricity Networks on Business Sites
Common questions
Is the MPAN the same as the meter serial number?
No. The MPAN identifies the supply point, while the serial number is printed on the meter itself and changes if the meter is replaced. SSEN and NIE Networks both accept the serial number with the address as a fallback when a bill is missing.
Do I need my MPAN to switch supplier?
A new supplier needs details of the meter before a contract is signed, along with annual consumption. The MPAN and, for gas, the MPRN are the numbers that identify that meter.
Has the MPAN format changed?
The top line has, and the 13-digit core has not. Under half-hourly settlement the top line shows the profile class, the standard settlement configuration and a tariff identifier, and it is now nine digits long.
Can anyone request the MPAN for a property?
Not from every operator. Electricity North West says you must be the owner or occupier of the property to request it. Landlords, council representatives and anyone making many requests are directed to a separate route.