Energy Monitoring for Business: What to Measure First and What the Data Decides
Updated 20 October 2026 · Renewable Energy for Businesses
Want to cut what your site uses and pays for energy?
Request a quoteWhy measure before you buy anything
Every renewable decision in a business plan depends on a number nobody has until they measure it: how much energy the site uses, and when. The size of a solar array that will actually be used on site, the value of a battery, the number of EV chargers the supply can carry and the heat load a heat pump must meet all come from the same data. Monitoring is the first step in the plan on the energy management page, and it costs far less than getting a system size wrong.
What to measure, in order
- Half-hourly electricity for the whole site. Ask your supplier for your half-hourly data, or fit a meter or logger on the incomer. A year of data shows the daily, weekly and seasonal shape.
- Gas or other heating fuel by month at least, ideally by day, so heat demand can be separated from process use.
- Sub-meters on the biggest or most uncertain loads: refrigeration, ventilation and cooling, process machines, compressed air, and any EV chargers.
- Drivers that explain the changes: outside temperature (degree days), operating hours, production output or occupancy. The degree days guide shows how to use them.
What to look for in the data
- Baseload: what the site draws overnight and at weekends. A high baseload is usually the cheapest saving, and it sets how much solar can be used at midday.
- Peaks: short, high demand that drives capacity charges and sizes batteries and EV load management.
- Daytime shape: how closely demand follows the sun, which decides how much generation is self-consumed rather than exported.
- Intensity: energy per square metre, per unit produced or per occupied hour, so you can compare months and sites fairly after weather and output changes.
From data to decisions
Efficiency measures come first because they shrink everything that follows: switch off what runs unnecessarily, fix controls and then size generation and storage on the reduced load. Solar sizing needs the daytime profile; a battery needs the peaks and the tariff; EV load management needs the half-hourly headroom between demand and supply capacity; a heat pump needs the heat load on the coldest days. Only then compare funding routes with the funding checker.
Where monitoring meets compliance
Large undertakings must comply with the Energy Savings Opportunity Scheme (ESOS): a large undertaking is one with 250 or more employees, or turnover above £44 million and a balance sheet above £38 million. The guidance says the audit should be based, where reasonably practicable, on verifiable energy consumption data measured over a 12-month period, and gives 31 December 2026 as the Phase 4 qualification date, with the notification of compliance due by 5 December 2027. If your business is close to those thresholds, a year of good monitoring data is the evidence the audit needs, and the guide to hiring an ESOS consultant covers who signs it off. Most smaller businesses are outside ESOS but gain the same decision-making benefit.
Questions to ask a monitoring provider
- What interval does the data come at, and can you export it in an open format?
- Which loads are metered separately, and what accuracy class are the meters?
- Who owns the data if you change provider?
- Does the platform normalise for weather and output, or only show raw usage?
- What is the total cost over three years, including the meters, software and installation?
Questions people ask
What should a business measure first?
Half-hourly electricity use for the whole site, because that profile decides how much of any solar generation you can use on site, what a battery would shave and whether EV charging fits the supply. Add gas or heat use, then sub-meters on the biggest loads.
Do I need sub-metering?
Only where a load is large enough or uncertain enough to change a decision. Refrigeration, ventilation and cooling, process equipment and EV chargers are the usual candidates. A single whole-site meter shows when you use energy, but not what is using it.
Is energy monitoring a legal requirement?
Not in general. Large undertakings that fall within the Energy Savings Opportunity Scheme must base their audit on verifiable energy consumption data measured over a 12-month period where reasonably practicable, so monitoring makes that audit easier, but most small and medium businesses are not in scope.