What to settle before asking for quotes on a standby generator: whether the site needs one, how big it should be, which fuel it may burn, the rules that shape the installation and what a quote should list.

Standby Generators for a UK business

When does a business need its own standby generator?

When it cannot stop, or cannot keep stock and people safe, for as long as a network fault may last. Ofgem's rules, which cover England, Scotland and Wales, give the local network operator 12 hours to fix a power cut outside severe weather, 24 hours in a category 1 storm and 48 hours in a category 2 storm. Compensation is a set sum that does not cover damaged equipment; the power cut compensation guide gives the amounts.

Electricity North West says on-site generation and backup power are a business decision and responsibility rather than the network operator's, and advises businesses to evaluate the need for a backup generator. For example, a hypothetical food wholesaler with cold rooms might ride out a 20-minute cut but not a 12-hour one; that is the gap a standby set closes. Hire suits temporary cover; in England and Wales, a hired mobile set left in one place for 6 months or more is treated as a static generator.

Generator, UPS or battery: which part of the job does each do?

A generator carries the site, or its essential circuits, through a long cut, but the load drops while the set starts. A UPS bridges that gap for equipment that cannot drop even briefly, such as servers, tills and controls. A battery keeps chosen circuits running only where it is designed and configured to operate independently of the grid, as the government's Be Ready guidance puts it. The backup power guide compares the three.

How is a standby generator sized for a site?

From the loads that must stay on, not from the size of the supply. Decide the scope first: a set for the whole site must match its peak demand, while a set for an essential-circuits board can be far smaller, at the cost of moving those circuits onto their own board. The backup power guide works through the arithmetic, from running and starting loads to kVA at the set's power factor, and the kVA to kW calculator converts in both directions. Three more points matter:

  • Rating basis. Ask which rating class and power factor a quoted figure uses, so two quotes describe the same duty.
  • Thermal input. Ask for the rated thermal input in megawatts thermal (MWth), which the permit thresholds below use; the manufacturer can supply it, calculated on net calorific value.
  • Growth and servicing. Allow for planned loads, and for cover while the only set is serviced; two smaller sets may suit better than one.

The transfer switch is chosen with the set: the changeover switch guide explains the types and how one is matched to the supply.

Which fuel can a business standby set use: diesel, HVO or gas?

Diesel. A set serving a business usually needs full-rate diesel. Outside the specific uses it lists, HMRC's Excise Notice 75 allows rebated red diesel for generating electricity only where 75% or more of the output goes to premises, or parts of premises, not used for commercial purposes; the red diesel rules guide explains the test and the listed uses.

HVO. Hydrotreated vegetable oil can replace diesel where the engine maker approves it in writing for the model quoted; the permit and storage duties stay the same. The HVO fuel guide covers duty and carbon reporting.

Gas. A mains gas or LPG set has no oil tank, and LPG sits outside the oil storage rules, but the emissions permit rules apply to any fuel. HSE says gas work in workplaces such as shops, restaurants, schools and hospitals must be done by a Gas Safe registered engineer qualified for it, and in factories and agricultural premises by a competent person. Ask the installer to confirm the gas supply can carry the set at full load.

Which permits, oil storage and grid rules apply?

Emissions permits

The medium combustion plant rules apply to each unit from 1 MWth to under 50 MWth, whatever the fuel and however few hours it runs, and an emergency-only set of that size still needs a permit; the backup power guide covers the exclusions and test hours. A new plant needs its permit before it is commissioned, and it counts as put into operation when fuel is first burned in it, including commissioning on site. For a second-hand set, the operator must hold proof of the date it was first put into operation, traceable by serial number or nameplate, so ask the seller for it.

Oil storage

A business container of 201 litres or more, including a stand-by generator's connected tank, falls under the rules, and its bund has to take 110% of what the container holds. A double-skinned tank is not secondary containment in itself, and a fixed tank must be bunded rather than stood in a drip tray. The tank must sit away from driveways, tanker turning circles and forklift routes unless barriers protect it, and needs an automatic overfill prevention device where neither it nor its vent pipe can be seen from the fill point.

Changeover and the network

Regulation 21 of the Electricity Safety, Quality and Continuity Regulations 2002 requires a source run as a switched alternative to the network to be unable to operate in parallel with it, and the low voltage installation to comply with BS 7671. A set that can run in parallel, even for a moment, falls under regulation 22, which, above the smallest sizes, requires specific requirements agreed with the network operator. SSEN, for one, connects such generation under the Energy Networks Association's G99 and asks for at least 15 days' notice before equipment above 50 kW is installed and commissioned.

Noise and planning

In England, councils must investigate complaints that could be a statutory nuisance, including noise from premises, and an abatement notice can stop an activity or limit it to certain times, so site and test the set with neighbours in mind. Planning permission is needed only for work that meets the legal definition of development, which includes building operations; the local planning authority is the first point of contact, and a listed building may also need listed building consent.

Scotland and Northern Ireland

The permit and oil storage rules above are guidance for England and Wales. In Scotland, SEPA says a business running its own generator, including a back-up or standby set, may be operating a medium combustion plant and is likely to need a permit from SEPA. In Northern Ireland, DAERA's guidance sends medium combustion plant on sites not already regulated to the district council, and separate regulations cover above-ground oil storage at commercial sites.

What should a supply-and-install quote list?

Enough for two quotes to be compared line by line:

ItemWhat the quote should state
The setkVA and kW at a stated power factor, the rating class, the rated thermal input in MWth and the fuels the engine maker approves
Load coveredWhole site or named circuits, the load assumed and any new board needed
ChangeoverManual or automatic, the switch's rated current, and whether it can ever connect the set to the network
Fuel and tankLitres and hours of running at the stated load, the bund, overfill protection and the tank's position
Enclosure and sitingAcoustic treatment, the base and the exhaust; Environment Agency guidance says not below windows or venting onto car parks, with flues terminated vertically
Electrical worksCabling, earthing, protection and the certification issued under BS 7671
Permits and noticesWho prepares any permit, network operator or planning application, and when
CommissioningA test on load, a simulated mains failure through the switch, and the handover documents
After handoverThe first service, the maintenance schedule and the test-hour log
ExclusionsGroundworks, crane access, the first fuel fill and removal of any old set

Questions to ask an installer

  • Which loads did you size the set for, and from what data?
  • Will the site need an emissions permit, and who will apply for it?
  • Can the switch ever connect the set and the network together, and if so, what has the network operator agreed?
  • What does the first year of servicing include? The generator servicing guide lists what a maintenance contract should cover.

Line two quotes up on the same rating basis, load, hours of fuel and changeover arrangement before comparing totals; exclusions often explain a gap. To have a set specified for your site, you can send an enquiry through the quote form.

Sources

All checked 24 November 2026.

Guides on this topic

Request a standby generator quote

By submitting you agree to our privacy policy. We never sell your details.

Standby Generators: common questions

Does a new standby generator need planning permission?

Not always, because some development is permitted under national permitted development rights. A council can remove those rights through a condition on a planning permission, so check the conditions attached to the building's own permission. A certificate of lawful development from the local planning authority gives formal confirmation where an application is not needed.

Can a business standby generator run on red diesel?

Usually not. Outside the specific uses HMRC's Excise Notice 75 lists, red diesel can generate electricity only where 75% or more of the output goes to premises, or parts of premises, not used for commercial purposes. HMRC defines commercial purposes as trading in goods or services with the intention of making a profit, so a set serving a shop, factory or office normally needs full-rate diesel. A machine found containing rebated fuel that should not be in it is liable to seizure and financial sanction.

Who is responsible for a generator's environmental permit?

The permit regime is written for the operator: the government's guidance is addressed to anyone who operates a medium combustion plant or a generator, and the owner of a mobile generator is responsible for its compliance with the specified generator controls. An installer or consultant can help prepare an application, so ask in writing who will apply and in whose name the permit will be issued.

Does commissioning count towards a backup generator's 50 test hours?

In England and Wales an emergency-only set may be tested for at most 50 hours a year unless the regulator agrees in writing to more, and that written agreement can exclude commissioning time. Ask about it before a long commissioning programme starts, and record the test hours for each set, because the record shows the set still meets the exclusion.

Does the network operator need to know about a standby generator?

If the set can never run in parallel with the network, regulation 21 places the duties on whoever operates it, so ask your own network operator whether it also wants to be told. If it can run in parallel, even for a moment during changeover, regulation 22 applies, and above the smallest sizes specific requirements must be agreed with the operator before it is installed or run.

Renewable energy guides by city

Local guides to renewable energy for businesses in each city:

London · Birmingham · Leeds · Sheffield · Manchester · Bradford · Liverpool · Bristol · Coventry · Cardiff · Leicester · Nottingham · Doncaster · Newcastle upon Tyne · Milton Keynes · Sunderland · Southampton · Hull · Wolverhampton · Plymouth · Derby · Stoke-on-Trent · Northampton · Swindon · Luton · Portsmouth · Reading · Oxford · Cambridge · Norwich · Castleford · South Wales · Stokesley · Northamptonshire · Wellingborough · Yorkshire and the Humber · East Midlands · East of England · North East · North West · Northern Ireland · Scotland · South East · South West · West Midlands

The rest of the renewable stack

Most businesses combine two or more of these. These measures work best designed as one integrated system.

Request a quote
Request a quote