Request a quoteOn-site generation is cheaper than the grid for a business only when the site's own cost of producing a unit is below the part of the bill that unit would otherwise have paid. Official studies compare generators with each other. A business compares its own system with its own bill. This guide gives the formula, a worked method with stated assumptions and a table of factors, and shows which bill lines on-site power does and does not avoid.
What does levelised cost of electricity mean?
DESNZ defines it: "A 'levelised cost' is the average cost of the lifetime of the plant per MWh of electricity generated." Its figures "reflect the cost of building, operating and decommissioning a generic plant for each technology". The IEA describes the method as "a levelised average lifetime cost approach, using the discounted cash flow (DCF) method".
In plain terms:
LCOE = (installed cost + discounted running costs over the life) ÷ (discounted units generated over the life)
Discounting means money and units further in the future count for less, at a rate that reflects the cost of capital. DESNZ's Electricity Generation Costs 2025 was published on 14 January 2026 and last updated on 18 March 2026, and comes with an Annex B "Example LCOE calculator" spreadsheet.
Is renewable energy actually cheaper?
At generator level the direction has been clear for some time. The IEA's 2020 edition found that "the levelised costs of electricity generation of low-carbon generation technologies are falling and are increasingly below the costs of conventional fossil fuel generation". DESNZ's 2025 report gives UK figures by technology, but they sit in its PDF and Annex A spreadsheet, so this guide does not reproduce them.
For a business the better question is different, because LCOE stops at the plant. The IEA says costs "are calculated at the plant level (busbar), and therefore do not include transmission and distribution costs", with system costs captured by a separate measure. A retail bill adds network, policy and supplier costs. Ofgem says wholesale costs can be "about 40% of your electricity bill". Generating more cheaply than a power station does not, by itself, show that on-site power beats the bill.
What is the cheapest form of energy in the UK?
DESNZ's report compares technologies on levelised cost for a stated commissioning year, and the result depends on the year, the financing assumptions and fuel prices. DESNZ's own collection page warns of "a large amount of uncertainty when estimating the future costs of electricity generation", because of "the difficulty in forecasting future fuel prices and the construction costs of technologies that have yet to be deployed at a large scale in the UK". Read the current table for the year that matters, and treat it as a guide to generators, not a quote for a site.
Which parts of a bill does on-site generation avoid?
A unit generated and used on site displaces a unit that would have been bought. The saving is the charges that depend on units bought, not the whole tariff.
| Bill element | Falls with each unit generated on site? | Why |
|---|---|---|
| Wholesale energy | Yes, for units no longer bought | Ofgem describes it as "the cost a supplier pays to buy energy" |
| Renewables Obligation | Yes | Suppliers present certificates "per megawatt hour (MWh) of electricity supplied" |
| Standing charge | No | It is paid "each day, even if you do not use any energy" |
| Capacity charge | No, unless capacity is reduced | Larger sites pay for "the amount of capacity you have reserved on our network" |
| Fixed residual charges | No | Ofgem made them "fixed charges for all households and businesses" |
| Other unit-based or time-based charges | Depends on contract and meter | Model from half-hourly data |
The avoided rate is therefore lower than the headline unit rate, and the non-commodity costs guide explains the lines. For scale on the wholesale layer, LCCC's Baseload Market Reference Price for October 2026 to March 2027 is £114.50 per MWh, or 11.45 pence per kWh. It is calculated from forward market data, so it is a wholesale reference, not a retail price. Units not used on site are exported and valued differently; this guide compares self-consumed units only. The business electricity price guide covers official unit prices.
How do I work out LCOE for a site?
- Collect the inputs. Installed cost from quotes, including connection and any storage the project needs; a first-year output estimate; expected life; yearly running cost; degradation; and the business's own discount rate. For solar, the European Commission's PVGIS tool answers "How much electricity could photovoltaics produce where I live?"
- Work out the ratio. Divide installed cost in pounds by first-year kWh. Call it K.
- Apply the factor. LCOE in pence per kWh is K multiplied by the factor in the table.
- Compare. Put the result beside the avoided rate from the bill table above, adjusted for the share of output used on site.
The factors below assume running costs of 1% of installed cost a year, output falling 0.5% a year, no replacement and no resale value. They are arithmetic from those assumptions, not market data. Each cell is the LCOE in pence per kWh when K is 1.0.
| Discount rate | 20-year life | 25-year life | 30-year life |
|---|---|---|---|
| 4% | 8.7 | 7.8 | 7.2 |
| 6% | 10.1 | 9.2 | 8.7 |
| 8% | 11.6 | 10.8 | 10.3 |
| 10% | 13.2 | 12.5 | 12.1 |
| 12% | 14.8 | 14.2 | 13.9 |
A hypothetical example: a quote works out at 1.2 pounds of installed cost for every kWh of first-year output (K = 1.2). Financed at 8% over 25 years, LCOE is 1.2 × 10.8 = about 13.0 pence per kWh. Whether that beats the grid depends on the avoided rate for the units used on site.
Which assumptions move the answer most?
Using the same model, and changing one assumption at a time:
- Discount rate. The IEA calls it "a key determinant of competitiveness", and "the more capital-intensive a technology, the more sensitive is its LCOE is to changes in the discount rate". In the table above, moving from 6% to 10% over 25 years raises the result by about 35%.
- Running costs. Raising them from 0.5% to 1.5% of installed cost a year adds about 10%.
- Life. At 8%, a 20-year life gives 11.6 against 10.3 for 30 years, about 11% lower.
- Degradation. Between 0.3% and 0.7% a year the difference is about 3%.
- Self-consumption. Only units used on site displace imports.
DESNZ commissioned hurdle rate research, published on 6 October 2025, covering several technologies. A business should use its own finance cost. For gas-fired on-site generation the comparison turns on fuel and electricity prices, covered in the spark spread guide. The renewable energy cost guide and the cost guide cover the project side. Readers who want to test a particular site can send an enquiry through the form on this page.
Sources and last checked
All pages were checked on 22 October 2026.
- Department for Energy Security and Net Zero: Electricity generation costs 2025 (published 14 January 2026, updated 18 March 2026); Energy generation cost projections (updated 14 January 2026); Hurdle rate estimates for electricity sector technologies (6 October 2025).
- International Energy Agency and OECD Nuclear Energy Agency: Projected Costs of Generating Electricity 2020 (9 December 2020).
- Ofgem: business energy costs blog (31 March 2026); how a bill is calculated; Renewables Obligation (31 March 2026); Targeted Charging Review decision (18 December 2019).
- Northern Powergrid: About us. Low Carbon Contracts Company: Baseload Market Reference Price Winter 2026 (5 October 2026). European Commission Joint Research Centre: PVGIS.
Guides on this topic
Common questions
Does LCOE include a battery or a grid connection?
DESNZ's figures cover a generic plant's build, operation and decommissioning, and the IEA's exclude transmission and distribution. A site calculation should add its own connection works and any storage the project needs.
Should a business use DESNZ's discount rate?
No. DESNZ uses hurdle rates estimated for each technology, researched for it by CEPA. A business should use its own cost of capital or finance rate, and test a range of rates.
Is LCOE the same as payback?
No. LCOE is a cost per unit over the system's life. Payback is the time taken for savings to repay the cost. Savings depend on how many units are used on site and on the avoided rate, so both need to be tested.
What if the grid price falls after the system is built?
The system's cost per unit is set when it is built, but the avoided rate keeps moving. Test the case against a lower avoided rate as well as today's, since wholesale prices and some policy costs change over the life.