What Is an IDNO? Independent Electricity Networks on Business Sites

Updated 28 October 2026 · Renewable Energy for Businesses

Need to know what your grid connection can take?

Request a quote

What is an IDNO, and who licenses it?

An independent distribution network operator (IDNO) owns and runs a local section of the electricity network. Electricity North West and UK Power Networks both describe an IDNO as a company licensed by Ofgem to own and operate electricity networks, and the licence is an electricity distribution licence: an Ofgem decision page of 1 November 2017 is headed "Notices to grant IDNO electricity distribution licences".

An IDNO network is not a separate grid. Electricity North West explains that it is connected to the DNO's local network, while the IDNO is responsible for managing and operating its own part, including all future maintenance and fault repairs. The area DNO's network feeds the development; the IDNO owns the network that serves the buildings on it.

Geography differs too. The area DNOs each serve a fixed licence area, Distributor IDs 10 to 23. ENA's table gives an IDNO no licence area: the column reads "N/A - IDNO", and MUA Electricity, one of the listed operators, says it is licensed to own and maintain networks nationwide. Which operator serves a unit depends on who adopted that estate's network, not on the town it sits in.

Why are new business parks often on an IDNO network?

Because the choice is made when the estate is built, usually long before the first lease. UK Power Networks says a network built by an Independent Connection Provider (ICP) will be adopted by either a DNO or an IDNO. That choice is made at the build stage, and every later occupier inherits it.

Money is part of it. MUA says IDNOs pay developers, housebuilders and connection providers to adopt newly built networks on housing or commercial developments, and that these Asset Value Payments can help reduce the cost of the electricity infrastructure. MUA adopts networks for commercial and industrial premises as well as new homes. The connection process itself is covered in the guide to getting a new business electricity connection.

Ofgem has also looked at IDNOs in larger connections. Its open letter of 19 October 2023 said the benefits of competition from IDNOs in extra high voltage connections, including those connected directly to the transmission network, may need to be reviewed, and its response of 21 March 2024 set out its priorities for reviewing the arrangements. A large user planning a high-voltage supply should ask early who will own the connection.

How can I tell if my premises is on an IDNO network?

Check the Distributor ID on an electricity bill, which ENA says shows which network operator looks after the connection. Numbers 10 to 23 are the area DNOs, listed in the guide to finding your DNO. From 24 upwards, ENA's table marks each number "N/A - IDNO" and names the operator; ESP Electricity, for instance, says all its MPANs begin with 25. The MPAN and MPRN guide shows where the number sits on a bill.

The table copies the IDNO rows of ENA's list on 28 October 2026, with names exactly as ENA gives them. GTC appears twice because, ENA notes, it operates and maintains assets for two IDNO licences, The Electricity Network Company Limited and Independent Power Networks Limited.

Distributor IDIDNO, as named in ENA's table
24Independent Power Networks (GTC)
25ESP Electricity
26Last Mile Asset Management
27The Electricity Network Company (GTC)
29Harlaxton Energy Networks
30Leep Electricity Networks
31UK Power Distribution
32Energy Assets Networks
33Eclipse Power Networks
34MUA Electricity
35Fulcrum Electricity Assets
36Vattenfall Networks
37Optimal Power Networks
38Indigo Power
39Stark Infra-Electricity
40Utility Assets
42Advanced Electricity Networks
43Independent Distribution Connection Specialists
44Green Gen Cymru
45Aurora Utilities

No bill yet? ENA's postcode lookup names the network operator for an address, and ESP asks anyone requesting work to use it first to confirm the premises is on its network.

What changes for a business on an IDNO network?

Less than most occupiers expect. What differs is who owns the cables, who carries out repairs and whose charging statement applies.

Choice of supplier

Nothing changes. MUA tells customers they pay their supplier for the electricity MUA delivers and can change supplier at any time without contacting MUA. ESP puts it the other way round: it does not supply electricity, so bill questions go to the supplier.

Network charges

The IDNO does not bill the business. MUA says independent network operators collect a fee from the energy supplier for delivering electricity through their cables and wires, and the guide to non-commodity costs explains how network charges reach a business bill.

The licence controls what the IDNO may charge. Ofgem explains that the electricity distribution licence requires a use of system charging methodology approved by Ofgem (standard condition 13) and a charging statement in a form Ofgem approves (condition 14). Its decision of 11 April 2018 refers to IDNOs with an approved charging methodology that replicates the use of system charges of the host DNO, and MUA says customers won't pay any more than they would on a DNO network.

Even so, read the IDNO's own charging statement for the tariff that applies to a supply of your size. Statements are published ahead of the charging year: GTC's regulation page already lists one for 2027-2028. If the aim is a lower bill overall, the cost guide sets out what solar, batteries and efficiency measures involve.

Power cuts and faults

The IDNO repairs its own network. UK Power Networks says an IDNO that adopts a network provides all ongoing network services, including maintenance and 24-hour fault repairs, and MUA says every IDNO is obliged to provide a 24/7 emergency response. In England, Scotland and Wales, 105 still works: MUA tells customers to call 105 or its own line to report a power cut.

Standards of performance and compensation

MUA describes IDNOs as licensed to the same safety, performance and service standards as a DNO. GTC lists the Electricity (Standards of Performance) Regulations 2015 and the Electricity (Connection Standards of Performance) Regulations 2015 among the rules behind its payments, which Ofgem sets, and says compensation may be due after a longer than expected interruption or repeated outages. ESP gives a power cut lasting more than 12 consecutive hours as one example. Amounts and claim rules are in the power cut compensation guide.

More capacity or a change to the supply

Apply to the IDNO, not the area DNO, for a bigger supply, an extra connection or a change to the existing one; ESP, for example, runs its own process for both. ENA's table gives each IDNO, like each DNO, an email address for EV notifications and a telephone number for supply assessment.

How does an IDNO compare with a DNO?

QuestionArea DNOIDNO
Who regulates it?Ofgem; its RIIO-ED2 price control sets DNO revenue for 2023 to 2028Ofgem, through an electricity distribution licence
Where does it operate?A fixed licence area, Distributor IDs 10 to 23No licence area; Distributor IDs from 24 upwards
Who owns and repairs the local cables?The DNOThe IDNO, whose network connects to the DNO's
Power cut number105105, or the IDNO's own line
Who handles more capacity?The DNOThe IDNO
How are charges set?Within the revenue Ofgem allowsAn Ofgem-approved charging methodology and charging statement; Ofgem refers to methodologies that replicate the host DNO's charges
Choice of supplierAny supplierAny supplier

What should I check before leasing or buying a unit on an IDNO network?

The network comes with the unit, so ask before signing:

  1. The MPAN and Distributor ID. Ask the landlord, agent or outgoing occupier, and match the ID to the table above.
  2. Who owns the network. It may be a licensed IDNO or a private network run by the estate owner. Schedule 3 of the Electricity (Class Exemptions from the Requirement for a Licence) Order 2001 exempts, as a class, anyone who never distributes electricity to supply domestic consumers, so a business-only estate may run its own wires without a distribution licence. If the unit has no MPAN of its own, ask how it is metered and billed and whether you can choose your supplier.
  3. The agreed capacity. Get the supply capacity in kVA in writing, confirmed by the network owner.
  4. How to get more. Ask the IDNO how it handles an increase, and whether a large one would need work on the DNO network feeding the estate.
  5. The charging statement. Find the current one and the tariff for a supply of your size.
  6. Solar, battery or charger plans. Raise them with the network owner at the same stage. The cost guide shows what each involves, and you can send the site details as an enquiry through the form on this page.

Sources

All pages checked 28 October 2026. If an operator's own page disagrees with this one, the operator's page is the authority.

Guides on this topic

Common questions

Is an IDNO the same as my electricity supplier?

No. The IDNO owns and runs the local cables, while the supplier sells the electricity and sends the bill. MUA Electricity, one of the IDNOs on ENA's list, says its customers can change supplier at any time without contacting it.

Will my business pay more for electricity on an IDNO network?

The IDNO charges your supplier, not you, under a charging methodology approved by Ofgem. Ofgem has referred to IDNO methodologies that replicate the host DNO's charges, and MUA says customers won't pay more than on a DNO network. Check the IDNO's charging statement for the tariff that applies to your supply.

What number do I call about a power cut on an IDNO network?

In England, Scotland and Wales you can call 105, which connects you to your local network operator. ENA's table also lists a safety number for each IDNO, and the IDNO, not the area DNO, carries out repairs on its own network.

What does 'N/A - IDNO' mean on ENA's list?

It means the operator has no licence area of its own. Where a DNO's row shows its region, an IDNO's row shows 'N/A - IDNO', because an IDNO is not tied to one region. MUA Electricity, for example, says it is licensed to own and maintain networks nationwide.