What Size Wind Turbine Does a Farm or Business Need? 5 kW to 500 kW

Updated 23 October 2026 · Renewable Energy for Businesses

Thinking about a wind turbine for your site?

Request a quote

How do you work out the right turbine size?

Start from demand and work backwards. The rated kW you need is the annual kWh you want the turbine to supply divided by 8,760 hours and by the capacity factor. The capacity factor is the share of its theoretical maximum the machine delivers over a year, which planning guidance calls the simplest way of expressing the energy capture at a site. The wind and CHP page covers whether on-site wind belongs in a plan at all.

  1. Get a year of consumption, half-hourly if the site has it, because the shape of demand sets how much output is used on site. The half-hourly settlement guide explains the data.
  2. Take the capacity factor from wind data, not a brochure. MCS's performance standard for small wind allows two routes: a Global Wind Atlas lookup of mean wind speed for the location, or at least six months of on-site monitoring. Planning guidance says the mean wind speed at hub height decides the energy captured.
  3. Run the sum for a low, middle and high capacity factor (tables below) and see which sizes survive the low case.
  4. Test the result against the thresholds below, then repeat for the next size.

What would a 5, 10, 20, 50, 100 or 500 kW turbine produce?

This is illustrative arithmetic, not a forecast: rated kW × 8,760 hours × the capacity factor shown. The 20% column is the capacity factor in the government's own worked example, which puts a 50 kW turbine at about 88,000 kWh a year.

Rated sizekWh a year at 10%kWh a year at 20%kWh a year at 30%Where it sits
5 kW4,3808,76013,140Within the small-wind definition
10 kW8,76017,52026,280Within the small-wind definition
20 kW17,52035,04052,560Within the small-wind definition
50 kW43,80087,600131,400Top of the definition (50 kW, 200 m² of rotor)
100 kW87,600175,200262,800Above it: full planning application
500 kW438,000876,0001,314,000Above it: full planning application

Rated power is the output at one wind speed: MCS rates small turbines at 11.0 metres per second. The Met Office's UK annual mean at 10 metres is 9.27 knots, about 4.8 m/s at the Met Office's conversion of 0.514 m/s per knot, so a turbine will spend much of the year below its rated speed. The same machine makes three times as much at 30% as at 10%, so site wind data decides the column; the UK wind speeds guide shows how much stations in one region differ.

How big a turbine does a farm's electricity use call for?

The government's consultation on small turbines quotes National Farmers Union estimates: some milking parlours and poultry units may use 44,000 to 88,000 kWh a year, and arable farms with electrical components 263,000 kWh. It says a 50 kW turbine could meet 100% of the demand of some milking parlours or poultry units, or 33% of an arable farm's. The table runs the sum in reverse, to the nearest kW.

Annual demandRated kW at 10%Rated kW at 20%Rated kW at 30%
44,000 kWh50 kW25 kW17 kW
88,000 kWh100 kW50 kW33 kW
263,000 kWh300 kW150 kW100 kW

Matching a year's total is not the same as covering demand hour by hour. Wind produces when it blows, so some output is exported and some demand is still imported. Steady loads such as refrigeration and pumping use more of the output on site than loads packed into working hours. Treat the size that matches annual demand as a ceiling to test; a smaller machine whose output is almost all used can do better.

Where do planning, environmental and grid rules change with size?

These thresholds apply in England. Scotland and Northern Ireland also require a planning application for a wind power development, and Wales has its own system, so start with the local planning authority.

ThresholdWhat changes
Any non-domestic turbineCurrent permitted development rights do not extend to turbines on non-domestic premises, so an application is needed.
Hub height above 15 m, or more than two turbinesEnvironmental impact assessment screening by the council, and compulsory pre-application consultation with the local community.
11 m to blade tip, or rotor 2 m or moreThe Ministry of Defence should be consulted.
50 kW and 200 m² of rotorMCS's small-wind definition, and the size limit in the 2026 permitted development proposal below (which adds a 30 m tip height).
50 kW three phase (17 kW single phase)Grid: a simplified G99 application up to this size, the standard application above it.
5 MWLargest wind installation in Great Britain eligible for Smart Export Guarantee (SEG) export tariffs.

What the 2026 proposal would change

The government consulted from 18 March to 10 June 2026 on a new permitted development right for a single small non-domestic turbine, up to 30 m tip height and 200 m² of rotor, certified to MCS or an equivalent standard, with council prior approval on siting, amenity and contamination. It would stand at least its tip height plus 10% from the boundary, and ten times its rotor diameter from a neighbouring occupied building: for a 15 m rotor, 150 m.

A hub above 15 m would still need screening: the consultation's own example, a 30 m tip height with a 22 m hub, would need a screening request. Government aims to respond in autumn 2026, and the consultation page still carried a closed-consultation label on 22 October 2026, so treat all this as a proposal.

What national planning policy now says

The National Planning Policy Framework published on 17 August 2026 gives substantial weight to small-scale and community-led renewable projects, and judges proposals outside plan-identified suitable areas against its policies as a whole. The gov.uk practice guidance page still carries wording last updated on 14 August 2023 that a wind application should not be approved unless the site is in a suitable area in a Local or Neighbourhood Plan. Ask the council which test it applies before paying for surveys.

What changes at 100 kW and 500 kW?

Above 50 kW or 200 m² of rotor a turbine is outside MCS's small-wind definition and the proposed right, so it goes through a full planning application. A taller hub catches more wind, because wind speed increases with height, but a hub above 15 m brings the screening and community consultation above.

On the grid, anything above 50 kW three phase follows the standard G99 application. National Grid Electricity Distribution says its Study & Offer route can consider design solutions at up to three capacities, a practical way to compare, say, 100 kW and 250 kW on one site. The DNO guide shows how to find your operator.

What should a sizing recommendation show?

  • The wind speed, its height and source (modelled or measured), and the capacity factor as a range.
  • Annual kWh for each size, and the share used on site.
  • Swept area against 200 m², hub height against 15 m, and the planning route that follows.
  • Whether the network operator has been approached.
  • Cost per kWh over the machine's life, using the method in the wind cost and planning guide and the service picture in the lifespan and maintenance guide.

For a view on a specific site, you can send an enquiry through the form on the wind and CHP page.

Sources and last checked

All pages below were checked on 22 October 2026. The official page is the authority if it disagrees with this one. The tables are illustrative arithmetic, not a prediction for any site.

Guides on this topic

Common questions

Can a farm put up a wind turbine without planning permission?

In England, not at present: government says current permitted development rights do not extend to turbines on non-domestic premises. A new right for small turbines was consulted on in 2026 but is only a proposal. Scotland, Wales and Northern Ireland have their own rules.

How many kWh does a 10 kW turbine make in a year?

Running at full rated output all year would be 87,600 kWh, which no turbine achieves. At the 10%, 20% and 30% capacity factors used in the table it works out at 8,760, 17,520 and 26,280 kWh. Measured wind at the hub height decides which figure applies.

Is 50 kW the largest turbine a farm can have?

No. It is the top of MCS's small-wind definition and the proposed ceiling for a permitted development right in England, not a legal cap on what a farm can build. Larger turbines are decided through a full planning application.

Can I sell surplus power from a farm turbine?

Wind installations in Great Britain up to 5 MW can apply for an export tariff under the Smart Export Guarantee (SEG) from a licensee. Each licensee sets its own payment and contract length, and any tariff must stay above zero. Offers differ, so compare them.