Anaerobic digestion (AD) breaks down plant and animal material in a sealed tank without air. NNFCC, which runs the Official Information Portal on Anaerobic Digestion, says the process releases a methane-rich biogas that can generate heat and power, and leaves a nutrient-rich material called digestate that can be used as fertiliser. For a business it makes sense where there is a steady supply of suitable material and somewhere to use both outputs. The wider options for on-site generation are on the wind and CHP solution page.

Which feedstocks work, and how much energy do they yield?

NNFCC says any biodegradable, non-woody plant or animal matter can be digested, and that wood products, paper and straw slow a digester because the micro-organisms cannot break down lignin. Food waste, slurry, manure, crops and crop residues all work. It calls a reliable supply fundamental to profitable AD, and says a long-term contract on acceptable terms is critical if feedstock is bought from a third party.

In England, workplaces must separate food waste from other waste from 31 March 2025, with micro-firms (fewer than 10 full-time equivalent employees) following by 31 March 2027. That separation does not itself send food waste to a digester; what happens next depends on the collector and the treatment sites it uses.

NNFCC publishes biogas yields per tonne of fresh feedstock. The table turns three of them into energy for 1,000 tonnes a year, using NNFCC's figure that a cubic metre of biogas at 60% methane converts to 6.7 kWh and its typical engine split of 35-40% to electricity and 40-45% to heat. This illustrates the method only, and the figures are rounded. Real plants use some biogas to heat the digester, and yields vary with dry matter (DM) and storage.

1,000 tonnes a yearBiogas (m³ per tonne)Biogas (m³)Gas energy (kWh)Electricity (kWh)Heat (kWh)
Cattle slurry (10% DM)15-2515,000-25,000100,500-167,50035,200-67,00040,200-75,400
Poultry (20% DM)30-10030,000-100,000201,000-670,00070,400-268,00080,400-301,500
Grass silage (28% DM)160-200160,000-200,0001,072,000-1,340,000375,200-536,000428,800-603,000

Slurry alone is a low-yield feed, so a plant built on it needs far more tonnage than one that adds a higher-yield material.

Should the biogas make power and heat, or go to the grid?

RouteWhat it involvesSupport in 2026
Engine for power and heat (CHP)NNFCC describes this as the most popular option for UK plants, because AD needs some heat itself. See the micro CHP guide for the heat-match testSmart Export Guarantee for export
Heat onlyNNFCC says even small plants have surplus heat, so a nearby user is neededThe non-domestic RHI is closed
Biomethane to the gas gridBiogas is cleaned and upgraded to over 95% methane and connected through the local gas network. The green gas guide covers the buying sideGreen Gas Support Scheme

How much does it cost to build an AD plant in the UK?

No official national price list could be sourced for this guide, and it does not use the older studies and vendor figures in circulation. NNFCC says the economics of AD are not straightforward because there are many variables. What can be said is what moves the bill:

  • Process choice. NNFCC says thermophilic systems cost more to build and need more management; wet AD has a lower set-up cost and dry AD is cheaper to run; horizontal plug-flow tanks cost more to build and run than vertical ones.
  • The gas route. An engine, a boiler, or an upgrading plant, plus an electricity or gas connection. NNFCC says connecting to the electricity network is costly.
  • Digestate. Storage and enough land that can accept it.
  • Permits, assessments and planning. Covered below.

The method is to use the AD cost calculator produced by The Andersons Centre for NNFCC, which covers capital costs, profits and the land needed for digestate and ranks the variables that matter most, then replace its inputs with written quotes. Its own disclaimer says it is a guide for comparison only and not for investment decisions.

What permits and consents does an AD plant need?

  • Environmental permit (England). The Environment Agency's standard rules SR2021 No 7 (anaerobic digestion facility) and No 9 (on-farm) cover facilities with a treatment capacity below 100 tonnes a day that accept no more than 35,000 tonnes on site a year. A site cannot be within 500 metres of a European site or Site of Special Scientific Interest, or within 200 metres of the nearest receptor from a combustion stack unless the stack is at least 7 metres high. NNFCC says plants that do not fit the standard rules need a bespoke permit. These rules apply in England; elsewhere in the UK the regulators and rules differ.
  • Combustion plant. A biogas engine or boiler of 1 MW thermal or more, and under 50 MW, is a medium combustion plant with its own permit rules.
  • Digestate. NNFCC says it must meet the Quality Protocol and PAS 110 (England and Wales) to stop being waste; otherwise waste controls apply to its handling and spreading.
  • Planning. NNFCC says most AD installations need permission, and any plant accepting third-party waste needs full planning permission.
  • Safety. HSE requires employers to classify areas where explosive atmospheres may occur into zones, and NNFCC lists flammable atmospheres, toxic gases and confined spaces among the hazards.

What support exists in 2026?

SchemePosition
Green Gas Support SchemePays on biomethane from AD injected into the gas grid. New Stage 1 applications close on 31 March 2028; on 16 October 2026 DESNZ extended the commissioning deadline to 31 March 2030. Stage 1 needs evidence of a connection agreement and planning permission details
Smart Export GuaranteeAD up to 5 MW in Great Britain, with sustainability criteria and reporting for AD generators; the licensee sets the rate
Non-domestic RHIClosed to new applications on 31 March 2021, with some applicants able to apply up to 31 March 2023
Feed-in TariffClosed to new applicants from 1 April 2019

Ofgem says plants commissioned after 31 March 2028 get a shorter tariff lifetime, with payments ending by 31 March 2043 at the latest, and that it runs an application budget queue, so check its budget table before relying on a place. The closed schemes guide covers what existing participants keep.

What are the disadvantages of anaerobic digestion for a business?

  • Capital and risk. NNFCC says private finance is available but can be difficult to obtain because of the capital expenditure and risks involved.
  • Feedstock. Gate fees on biowaste can vary significantly, so a plan that leans on them is fragile.
  • Digestate outlets. NNFCC says there must be enough land nearby to take it within Nitrate Vulnerable Zone restrictions, so work out the land area before the tank.
  • Hazards and neighbours. AD is a chemical process, and noise, odour, visual impact and transport are the common concerns in planning.
  • Biomethane barriers. NNFCC says upgrading adds substantially to cost and energy use, can reduce carbon savings, and plants may be far from the gas network.

A reader can send an enquiry through the site's form to explore whether AD or another route on the wind and CHP page suits a site.

Sources and last checked

Every source below was checked on 22 October 2026. NNFCC pages carry no date and some of their wording is older than the 2026 position, so they are used for how AD works, not for scheme status.

Common questions

Do businesses have to separate food waste in England?

Yes. Defra's guidance says workplaces must always separate dry recyclable waste, food waste and non-recyclable waste before collection, and micro-firms with fewer than 10 full-time equivalent employees have until 31 March 2027. Separation does not decide where the waste is treated, although NNFCC says AD or composting are usually the preferable options for food waste.

Is digestate classed as waste?

It can be. NNFCC says that in England and Wales digestate must meet the Quality Protocol and PAS 110 if it is not to be considered waste. If it does not, waste management controls apply to its handling, transport and application.

What is the difference between biogas and biomethane?

NNFCC describes biogas as a mixture of around 60% methane and 40% carbon dioxide with traces of other gases. Biomethane is biogas that has been cleaned and upgraded to a methane content above 95%, so that it resembles natural gas and can be injected into the gas grid.