HNTAS Explained: The Heat Network Technical Assurance Scheme for Building Owners

Updated 28 October 2026 · Renewable Energy for Businesses

Weighing up a heat pump or other low-carbon heating?

Request a quote

What is HNTAS, and who is setting it up?

The Energy Act 2023 gives the government the power to mandate heat network technical standards in Great Britain through regulations, and the Department for Energy Security and Net Zero (DESNZ) is designing the scheme, which it consulted on from 21 January to 15 April 2026. DESNZ says it will apply to networks from communal systems up to city-wide district schemes. Schedule 18 to the Act lets the standards cover design, construction, commissioning, operation, maintenance and decommissioning, the equipment and materials used, and the competence of the people doing the work.

With Ofgem as regulator, a Code Manager would maintain the Code documents: technical specifications, assurance procedures and the requirements for assessors and certifiers. A Scheme Operator may run it day to day, and assessors would be registered by the Code Manager. The proposals cover England, Scotland and Wales, with the Scottish and UK governments committed to working together on common standards, and will not extend to Northern Ireland.

The 2022 Heat Network Consumer and Operator Survey, cited by DESNZ, found that 50% of heat network consumers reported some loss of heating or hot water over a year, against 29% of other customers, and 40% of operators reported unplanned outages. Only 42% of operators were aware of CP1, the voluntary code of practice.

How does HNTAS fit with Ofgem's regulation?

Ofgem began regulating heat networks under new consumer protection rules on 27 January 2026, and operators and suppliers of relevant networks must give it their details by 26 January 2027. HNTAS adds a technical layer later, tied to that regime. The consultation proposes that signing an agreement with the HNTAS Code Manager will be an authorisation condition, and that the Responsible Party signed up with HNTAS must be the same entity Ofgem has authorised. Ofgem would police the authorisation conditions and the Code Manager the Code. Registration and roles are covered in the heat network regulation guide.

Which heat networks would HNTAS cover?

On the January 2026 proposals, it would be compulsory for new networks and for about 12,000 existing ones across Great Britain, district and communal alike. The proposed edges, none of them yet law:

NetworkProposed position (consultation, January 2026)
Any network below six properties, or the capacity equivalentNot required to meet HNTAS requirements or engage with the Code Manager
Existing non-domestic or mixed-use networkIn scope above 450 kW of total connection capacity
New non-domestic or mixed-use networkIn scope above 225 kW
New network at feasibility or design stage at launchIn scope with six or more properties
Industrial sitesExcluded at launch, with the option to review later
Shared ground loop networksIn scope
Networks used only for air-conditioningNot regulated by Ofgem and not required to meet the standards

The capacity test is for networks where counting homes does not fit: it lets operators of non-domestic or mixed-use networks check whether they are in scope, and under 450 kW of total connection capacity counts as the equivalent of 10 properties or less. For example, an existing multi-let office building heated from one plant room would be judged on its connection capacity, not on its number of tenants.

Each network would need a Responsible Party, typically the party developing or operating it. Because that party must be the entity Ofgem authorises, a landlord holding the operator role would, on these proposals, be the one signing up to HNTAS.

What would HNTAS require of a network?

The technical standards

The starting point is CP1 (2020), the code of practice published by the Chartered Institution of Building Services Engineers (CIBSE), which DESNZ says will be the basis for the minimum standards, though not an exact copy of them. TS1, a new Heat Network Technical Standard, is to supersede CP1, and DESNZ will release its final version before HNTAS launches. DESNZ published draft technical specifications and assessment procedures for new build networks in December 2025 and for existing networks in January 2026, alongside a draft Metering and Monitoring Standard.

Assessment for new networks

A new network would need an assessment pass before it is allowed to start design, before construction and before operation, and again after 2 years of operation. The draft requirements have been piloted on eleven new build networks and on existing networks.

Certification and ongoing monitoring

Passing the assessments would earn a HNTAS certificate. The operator would then submit data regularly to a HNTAS digital portal to show the network still meets the scheme's key performance indicators. For certification, the consultation says an assessor is likely to need evidence of:

  • heat losses no higher than 200 W per dwelling;
  • bypass flow rates below a set level;
  • a stable flow temperature and an acceptable difference between flow and return temperatures;
  • an acceptable number of unplanned interruptions;
  • minimum water quality being met;
  • heat meters in the energy centre, at the entry point to every building and at dwelling level for all end consumer connections.

The proposed heat loss limits step down: 400 W per dwelling at the three-year milestone for existing networks, 200 W for their final certification, and a proposed 100 W for new build.

Enforcement and who pays

A certified operator that falls short would get a period to put things right. If it does not, the Code Manager could withdraw certification and take formal action. Most assessment work is envisaged to be paid for through commercial arrangements with whoever commissions it. Grants and early-mover incentives for existing networks are only options in the consultation.

What is the HNTAS timeline?

Dates as DESNZ and Ofgem have published them:

DateStepStatus on 28 October 2026
November 2025Draft TS1 publishedDone, draft
December 2025Draft specifications and assessment procedures for new build networksDone, draft
January 2026Drafts for existing networks; draft Metering and Monitoring StandardDone, draft
21 January to 15 April 2026HNTAS consultationClosed; responses being analysed
27 January 2026Ofgem begins regulating heat networksIn force
26 January 2027Ofgem deadline for operators and suppliers to give their detailsIn force
Early 2027Consultation response; final Code documents, Metering and Monitoring Standard and TS1Planned
2027Regulatory commencement of HNTAS, phased in over timePlanned
2030Carbon emissions limit for the heat network in each zone in EnglandPlanned

DESNZ says some parts of the scheme may be opened for voluntary use once its response is published.

Proposed milestones for existing networks

For running networks, the consultation proposes a staged path counted from commencement. The timescales depend on whether a network is already under the metering rules of the Heat Network (Metering and Billing) Regulations 2014 (HNMBR), which largely means networks built after 2014 (see the communal heating metering and billing guide).

Proposed milestoneNetworks under HNMBR metering rulesOther existing networks
1. Register with the Code ManagerWithin a year of commencementWithin a year of commencement
2. Statement of Conformity on metering, monitoring and threshold performanceEnd of Year 3, with plant room, block and dwelling meteringEnd of Year 3, with plant room and building entry metering
3. Approved Performance Improvement PlanSame Year 3 deadlineYear 4
Dwelling-level metering for all end customersPart of milestone 2Year 5, with feedback invited
4. Certificate 1End of Year 6 in the consultation's worked exampleYear 8
5. Certificate 2Within 2 years of Certificate 1Within 2 years of Certificate 1

A network certified within three years of launch would skip milestone 3. A network due for replacement would need declaring End of Life within 3 years of commencement, and networks built but not yet operating at launch would have 4 months to declare their assurance pathway.

What should an existing network operator or landlord do now?

  1. Settle the Ofgem position. Use Ofgem's definitions to decide whether the organisation is operator, supplier or both, and give Ofgem its details by 26 January 2027.
  2. Check the proposed scope. Count the properties on each network or, for non-domestic and mixed-use networks, find the total connection capacity and compare it with the six-property and 450 kW lines.
  3. Find out which timetable applies. Establish whether each network is under HNMBR metering requirements, because the proposed deadlines differ.
  4. Benchmark against CP1 (2020). DESNZ says CP1-compliant networks will be very well prepared.
  5. Start on metering. Existing networks are to get a significant transition period to put the right metering in place to prove performance.
  6. Read the drafts and train staff. The draft documents were published to help the sector become familiar with the proposed requirements, and BESA, the HNTAS Shadow Training Provider, has courses available to book.
  7. Plan improvements early. The consultation says operators should look to improve their networks at the earliest possible point.

For an owner weighing low-carbon plant in an upgrade, the commercial heat pump page explains how heat pumps work at business scale, and readers can send an enquiry through the form on this page.

How does HNTAS relate to heat network zoning?

Zoning is a separate, England-only policy: the Energy Act 2023 gives the government powers to bring it in through regulations, and gov.uk says the first zones are being progressed ahead of the legislation coming into force. DESNZ's January 2026 zoning response says HNTAS will set mandatory minimum technical standards and metering requirements for applicable networks across Great Britain, including those in heat network zones in England. It adds that from 2030 the heat network in each zone will face a maximum annual average carbon emissions limit, with operators reporting emissions data each year through the HNTAS digital service, which is still in development. The heat network zoning guide covers which buildings could be asked to connect.

Sources

Guides on this topic

Common questions

No. DESNZ plans a launch in 2027, phased in over time, and responses to the consultation that ran until 15 April 2026 are still being analysed. The duty that applies now is Ofgem's: operators and suppliers of relevant heat networks must give Ofgem their details by 26 January 2027.

Does a small communal system with a handful of flats fall under HNTAS?

Not on the January 2026 proposals if it serves fewer than six properties, or the capacity equivalent. Such a network would not have to meet HNTAS requirements or engage with the Code Manager. It may still be a heat network for Ofgem's purposes, because Ofgem's definition covers heat supplied to more than one property in a building.

Is a network that already meets CP1 automatically HNTAS compliant?

Not automatically. DESNZ says CP1 (2020) will be the basis for the minimum standards but will not be an exact representation of them, and TS1 will supersede CP1. A CP1-compliant network should be very well prepared, in DESNZ's words.

Who pays for an HNTAS assessment?

The consultation envisages most assessment activities being funded through commercial arrangements between the Assessment Organisation and the Responsible Party or duty holder that commissions the work. Grants and early-mover incentives for existing networks are floated in the consultation as options only.

Does HNTAS apply in Scotland and Northern Ireland?

The proposals relate to England, Scotland and Wales and will not extend to Northern Ireland. Heat is largely devolved in Scotland, and the consultation says the Scottish and UK governments are committed to working together to develop common standards.