Decarbonising Process Heat: Low-Carbon Options for UK Manufacturers
Updated 23 October 2026 · Renewable Energy for Businesses
Weighing up a heat pump or other low-carbon heating?
Request a quoteProcess heat is the hot water, steam and direct heat a factory uses to make its products. What can replace fossil fuel firing depends first on the temperature needed. Heat pumps are commercial at the lower end, electric boilers reach higher but cost more to run, biomass and hydrogen are for the hardest loads, and recovering waste heat cuts demand before any of them is sized. This guide sets out the options by band, what each needs from the grid, the site and the fuel supply, and the funding position after the Industrial Energy Transformation Fund (IETF) closed. Building heating is a separate subject, covered in the electric boiler guide and the commercial heat pump page.
How do the options differ by temperature band?
The International Energy Agency (IEA) says that in less energy-intensive industries, such as food processing, textiles and machinery production, about 75% of heat demand is below 200°C, and that those industries account for around 30% of total industrial energy use. The IEA figures are global. No UK split by temperature band was available in a form that could be cited here, so a site should measure its own loads.
| Band | Options named in the sources | How ready they are, according to the IEA |
|---|---|---|
| Below about 120°C, such as hot water and low-temperature drying | Industrial heat pumps; recovered heat | Heat pumps below 120°C have entered commercial operation in recent years |
| About 120 to 160°C | Industrial heat pumps; electric boilers | Heat pumps are starting to enter commercial operation below 160°C; electric boilers are used at higher temperatures |
| Up to about 400°C, covering much steam use | Electric boilers; biomass; solar and geothermal where the site suits | Electric boilers are used above about 150°C; the IEA said in 2018 that solar and geothermal can also be economical below 400°C |
| Above 400°C, such as kilns and furnaces | Biomass; electrification for specific processes; hydrogen trials | Higher heat pump temperature levels remain at demonstration, prototype or concept stage; bioenergy is resource-constrained |
The IEA's 2026 Heat Pump Monitor says commercially available heat pump systems could technically already supply up to around 20% of industrial heat demand globally, and that adoption in industry is growing but remains niche. It adds that heat pump projects often require customised engineering, co-ordination across production sites and secure grid connection.
Why should heat recovery come first?
The IEA noted in 2018 that improved insulation or heat recovery can reduce final demand before the heat is even generated. A 2014 study for the then Department of Energy and Climate Change, published on 26 March 2014, identified 48 TWh a year of industrial waste heat sources across the eight heat-intensive sectors it covered. It put the technical potential at 11 TWh a year and the economic potential at 8 TWh a year, and found commercially viable recovery options in all eight sectors. Most of the waste heat was therefore not economic to recover. The figures are old, but the gap between what exists and what pays shows why a site audit comes before a technology choice.
What do electric and electrode boilers need?
Electrode boilers belong to the electric boiler family, so the points below apply to them. The IEA says electric boilers cost about the same to buy and install as natural gas boilers, but their energy costs are considerably higher, and that the high energy costs of electric boilers prevent them from being competitive across regions in the sectors it examined. The running-cost gap, not the equipment, is the hurdle, and the electric boiler guide works through the arithmetic.
The second hurdle is the grid. Ofgem said on 13 February 2026 that the demand connection queue is large and growing and contains a significant number of projects that are likely non-viable, and it described reform built around three pillars: Curate, Plan and Connect. A factory planning a large electrical load should find out who its network operator is early, using the network operator guide.
Eligible energy-intensive industries get some help with the cost side. The British Industry Supercharger offers up to 90% compensation for network charging costs, and the Supercharger and BICS guide sets out who qualifies and the dates.
Where do biomass and hydrogen fit?
Biomass. The IEA says bioenergy can be used for high-temperature heat demand but is resource-constrained. On site, Forest Research notes that biomass is a low energy density fuel, so a large volume must be stored. The fuel, store, smoke control and chimney rules are in the biomass boiler guide.
Hydrogen. Government-funded work is at demonstration and design stage. The Industrial Hydrogen Accelerator Programme funded projects generating evidence on end-to-end industrial fuel switching to hydrogen. Two Stream 2B projects show the stage reached. Asphalt production will be demonstrated at Heidelberg Material's Criggion asphalt plant in North Wales. In Sheffield, a project to convert steel reheat and heat treatment furnaces from natural gas to hydrogen is in its front-end engineering design phase. These are not catalogue products for a typical factory.
What funding is there for process heat in 2026?
- IETF. GOV.UK says that following the Spending Review it was decided there would be no further extension of the IETF, and that no successor fund is planned. The collection page, updated on 25 June 2026, adds that the government committed £163 million to continue delivery for all current projects in Phases 1 and 2. Projects already funded continue. GOV.UK has published a final process evaluation of Phases 1 and 2 and, on 25 June 2026, an interim impact evaluation that builds on it, both useful for design lessons.
- Electricity cost relief. The Supercharger and BICS apply to qualifying manufacturers only; see the dedicated guide.
- Tax relief and finance. The capital allowances guide and the grants and funding page cover the routes that remain.
How should a manufacturer start?
For example, a hypothetical food plant might use 80°C wash water, 140°C process water and 180°C steam. The questions below would split that into three separate decisions rather than one.
- Map heat loads by temperature and by hours of use, from metered data.
- Cut demand and recover heat from exhausts, compressors and cooling before sizing anything.
- Match each band to the options above, using the readiness evidence rather than supplier claims.
- Check electrical capacity with the network operator before committing to an electric option.
- Confirm the funding position, since the IETF has closed.
Readers can send an enquiry through the form on this page, and the heat pump page covers the electric options.
Sources and last checked
- International Energy Agency, checked 22 October 2026: Heat Pump Monitor 2026, key findings, low-temperature heat commentary (9 December 2025), EU electrification commentary (9 June 2026) and clean and efficient heat for industry (22 January 2018) and the global heat demand chart notes (updated 6 July 2026).
- GOV.UK, checked 22 October 2026: IETF guidance, the IETF collection (25 June 2026), the interim impact evaluation (25 June 2026), surplus heat study (26 March 2014), the Industrial Hydrogen Accelerator Programme, its Stream 2B projects (12 November 2025) and BICS guidance (12 October 2026).
- Ofgem, checked 22 October 2026: demand connections reform (13 February 2026).
- Forest Research, checked 22 October 2026: pellet stoves and boilers.
Guides on this topic
- Thermal Energy Storage for Business: Storing Heat and Cold to Shift Energy Use
- UK CBAM Explained: Who Pays the Carbon Border Adjustment Mechanism From 2027
- The UK Emissions Trading Scheme: Which Businesses Are In and What It Costs Them
- HVO Fuel for Business: What It Is, Where It Fits and What It Saves
- The IETF Has Closed: What Manufacturers Can Use Instead
Common questions
Is an electrode boiler a heat pump?
No. The IEA describes heat below 150°C as something a heat pump can supply, and says electric boilers are used at higher temperatures. Electrode boilers belong to the electric boiler family.
Is there still a grant for industrial heat pumps?
Not through the Industrial Energy Transformation Fund, which closed in July 2025 with no successor fund planned. Projects it already funds continue. Tax relief and other routes are on the grants and funding page.
How much industrial heat could heat pumps supply?
The IEA says commercially available heat pump systems could technically already supply up to around 20% of industrial heat demand globally. It also says adoption in industry is growing but remains niche. The figure is global, not UK.
Is hydrogen available for furnaces yet?
Government-funded work so far is at demonstration and design stage. One project is a demonstration at an asphalt plant in North Wales, and another is a design study for steel reheat furnaces in Sheffield. A factory planning around hydrogen should confirm supply for its own site.