The UK Emissions Trading Scheme: Which Businesses Are In and What It Costs Them
Updated 10 November 2026 · Renewable Energy for Businesses
Not sure which technology fits your site?
Request a quoteWhat is the UK ETS and who runs it?
The UK Emissions Trading Scheme (UK ETS) is a cap-and-trade scheme. A cap on emissions from the sectors it covers is divided into allowances, each worth one tonne of carbon dioxide equivalent (tCO2e), and every year each covered operator must surrender enough allowances to cover its emissions. The cap falls over time, so the total that can be emitted shrinks.
The UK, Scottish and Welsh Governments and Northern Ireland's Department of Agriculture, Environment and Rural Affairs, acting together as the UK ETS Authority, set it up on 1 January 2021 under the Greenhouse Gas Emissions Trading Scheme Order 2020. DESNZ's policy overview, updated on 21 October 2026, says it covers heavy industry, power, aviation and domestic maritime, about 25% of UK territorial emissions. The Authority has decided to extend it into a second phase, from 1 January 2031 to 31 December 2040.
Which businesses are in the UK ETS?
| Activity | In scope from | What to check, and source |
|---|---|---|
| Burning fuel on a site whose combustion units total more than 20MW rated thermal input | 1 January 2021 | Add up every unit except those below 3MW and those burning only biomass (2020 Order, Schedule 2) |
| Listed industrial activities, for example glass or paper above 20 tonnes a day, or ceramics above 75 tonnes a day | 1 January 2021 | Each activity's capacity threshold (2020 Order, Schedule 2) |
| Aviation: UK domestic flights, UK to Gibraltar, and departures to the European Economic Area and Switzerland | 1 January 2021 | Applies to any operator flying those routes (Participating in the UK ETS) |
| Domestic maritime: ships of 5,000 gross tonnage and above | 1 July 2026; offshore vessels from 1 January 2027 | First surrender, by 30 April 2028, covers July 2026 to December 2027 (Participating in the UK ETS) |
| Waste incineration and energy from waste | Not 2028 as first planned; new timeline to come | Voluntary monitoring and reporting has been open since 1 January 2026 (policy overview) |
| Greenhouse gas removals | Planned: legislation by the end of 2028, operating by the end of 2029 | Subject to legislation and further consultation (policy overview) |
Some sites sit outside the scheme altogether: installations burning only biomass, those mainly used for research and development, and incinerators whose main purpose is burning hazardous or municipal waste. Northern Ireland's electricity generators stay in the EU ETS.
Smaller sites: the hospital and small emitter and ultra-small emitter routes
Hospitals and small emitters have a simpler route. DESNZ defines small emitters as "installations with a rated thermal input of below 35MW and emissions lower than 25,000t CO2e per annum". These hospital and small emitters (HSEs) still report their emissions each year, but meet an emissions target instead of surrendering allowances. Separately, "installations with emissions lower than 2,500t CO2e per annum may obtain ultra-small emitter status": they need no permit, but must monitor their emissions and tell the regulator if they go over the threshold. Both application windows for the 2026 to 2030 allocation period have closed, so a site in scope that is not on the published lists is in the full scheme.
What must an operator do each year?
- Hold a permit. An installation needs a greenhouse gas emissions permit or an HSE permit before it starts the activity; apply through the METS online service at least 2 months ahead.
- Monitor reportable emissions from 1 January to 31 December under the approved monitoring plan.
- Appoint a verifier accredited by the UK Accreditation Service (UKAS); the regulators' calendar suggests doing so by July.
- Report by 31 March: submit the annual emissions report and verification report for the previous year.
- Surrender by 30 April allowances equal to the previous year's reportable emissions, in the UK ETS Registry.
The regulator depends on location: the Environment Agency in England, the Scottish Environment Protection Agency, Natural Resources Wales, the Northern Ireland Environment Agency, and the Offshore Petroleum Regulator for Environment and Decommissioning offshore.
What happens if a deadline is missed?
The Environment Agency's enforcement annex, updated on 10 October 2025, sets out the main civil penalties:
- Allowances not surrendered by 30 April: an excess emissions penalty of £100, multiplied by an inflation factor, for each allowance missing. The Agency says it cannot apply discretion because this penalty "is mandatory".
- Breaching most permit conditions: £20,000, plus £500 a day after an initial notice, up to £45,000.
- An HSE over its target: the excess tonnes multiplied by that year's carbon price.
- Operating without a permit: the costs avoided, including the allowances that should have been bought at that year's carbon price, plus a punitive element normally of at least £2,500.
What does the UK ETS cost a business?
Operators get allowances in three ways: free allocation, for eligible sectors at risk of carbon leakage; auctions run by the Authority on ICE Futures Europe; and the secondary market. The 2027 calendar has 25 fortnightly auctions starting on 13 January 2027. Bids below the auction reserve price, £28 since 8 April 2026 and £29.01 from 1 January 2027, are not accepted.
Above that floor, the market sets the price of an allowance. The clearest official reference is the Authority's carbon price for civil penalties: £49.41 per tCO2e for 2026, determined on 28 November 2025 from the average settlement price of the December 2026 allowance futures contract over the 12 months to 11 November 2025. Regulators use it to calculate penalties such as an HSE's excess; it is not a forecast or a quote for buying allowances today.
For example, a hypothetical site emitting 30,000 tCO2e a year with 10,000 free allowances must find 20,000 more. Valued at that £49.41 reference, they would cost £988,200; the real figure depends on the auction or market prices when they are bought. On top come the permit application fee (shown in METS, or on the regulator's website), the verifier's fee and the cost of monitoring.
Two further points affect the bill. Free allocation for sectors covered by the UK carbon border adjustment mechanism (CBAM) is being phased out over an indicative nine years from 2027. And some energy-intensive industries may be able to claim compensation from the Department for Business and Trade for the indirect costs of the UK ETS and Carbon Price Support; claims cannot be backdated.
How does the UK ETS fit with CBAM, climate change agreements and the EU?
- CBAM. From January 2027, specified imports from sectors at risk of carbon leakage face a carbon price comparable to the one UK producers pay. The UK CBAM guide explains who pays.
- Climate change agreements. A facility can be in both: the 2026 statutory guidance counts energy used in UK ETS processes towards the agreement's 70% eligibility test, but excludes fuels covered by the UK ETS from the energy its targets are set against.
- Climate Change Levy. The levy is a separate tax on the electricity, gas and solid fuels a business uses; the Climate Change Levy guide covers rates and reliefs.
- Electricity cost relief. Eligible manufacturers should also check the Supercharger and BICS schemes.
- Linking with the EU ETS (negotiations). The UK and EU agreed in May 2025 to work towards linking their schemes and began negotiating after the EU approved its mandate in November 2025, aiming to finish by the next UK-EU summit. No link is in force; the policy overview is the place to check.
What cuts a site's UK ETS bill?
Every tonne not emitted is an allowance a site does not have to find, so the levers are the ones that cut fuel burned on site: efficiency and heat recovery, electrification and fuel switching. Biomass gets particular treatment in the 2020 Order: units burning only biomass do not count towards the 20MW threshold, and an installation burning only biomass is outside the scheme. The process heat guide sets out the options by temperature, and the grants and funding page lists the routes that can help pay for them. Combined heat and power can cut total fuel use but adds combustion on site, so model the UK ETS effect alongside the tax reliefs in the CHPQA guide. A site considering HVO should read the HVO guide first.
Sources
All checked 10 November 2026.
- DESNZ: UK ETS policy overview (21 October 2026); Participating in the UK ETS (1 July 2026); Taking part in the UK ETS markets (21 October 2026); Carbon price for use in civil penalties, 2026 (28 November 2025); Determinations of the UK ETS carbon price (28 November 2025); Climate Change Agreements: statutory guidance 2026 (24 February 2026).
- Environment Agency and DESNZ: UK ETS for installations: how to comply (9 February 2026); UK ETS for hospital or small emitters: how to comply (30 March 2026).
- Environment Agency: Enforcement and sanctions policy, annex 2: climate change schemes (10 October 2025).
- legislation.gov.uk: The Greenhouse Gas Emissions Trading Scheme Order 2020, Schedule 2.
- HMRC: Environmental taxes, reliefs and schemes: Climate Change Levy.
- Department for Business and Trade: UK ETS and Carbon Price Support: apply for compensation (27 April 2026).
- HM Treasury: CBAM factsheet (28 November 2025).
Common questions
What is the UK ETS carbon price today?
No single price is set; allowances trade at auction and on the secondary market. The latest official reference is the Authority's 2026 carbon price for civil penalties, £49.41 per tonne, set on 28 November 2025. Bids at auction below the reserve price, £28 now and £29.01 from 1 January 2027, are not accepted.
Is a hospital boiler house automatically in the UK ETS?
Only if the site's combustion units total more than 20MW rated thermal input, counting units of 3MW or more that do not burn only biomass. A hospital on the published hospital and small emitter list reports its emissions and meets a target instead of surrendering allowances. The window to join that list for 2026 to 2030 has closed.
How is the UK ETS different from the EU ETS?
They are separate schemes with separate markets for allowances. Linking, which the UK and EU are negotiating, would make allowances usable in both while each scheme keeps its own cap, but no link is in force. Northern Ireland's electricity generators remain in the EU ETS.
Does a small factory with a few gas boilers need to do anything?
Usually not, unless its combustion units add up to more than 20MW rated thermal input or it carries out a listed activity above its threshold. Units below 3MW are left out of the total. A site near the threshold should check with its regulator before adding plant.