Energy Bill Relief for Manufacturers: The Supercharger Now, BICS From 2027

Updated 23 October 2026 · Renewable Energy for Businesses

Working out how to fund an energy project?

Request a quote

Two government schemes cut the electricity costs of some manufacturers in Great Britain, and neither covers an ordinary office, shop or warehouse. The British Industry Supercharger is for energy-intensive industries (EIIs). The British Industrial Competitiveness Scheme (BICS) is wider, aimed at eligible manufacturers in the government's priority sectors and the foundational industries that supply them. This guide sets out what each pays, who qualifies, how they interact and the dates. Other help with bills is on the help with business energy bills page.

What is the British Industry Supercharger?

The Department for Business, Innovation, Science and Trade describes it as "a package of electricity cost relief measures for eligible GB-based Energy-Intensive Industries". It has two parts. The first is a full exemption from the costs of the Renewables Obligation, Feed-in Tariffs, Contracts for Difference and the Capacity Market. The government's response to its 2025 consultation says the first three have applied since 1 April 2024 and the Capacity Market exemption since October 2024.

The second part is compensation for network charging costs. The department's BICS guidance describes "up to 90% compensation for Network Charging costs, such as Transmission Network Use of System (TNUoS), Distribution Use of System (DUoS) and Balancing Services Use of System (BSUoS) charges". It puts the total support at "approximately £65 to £87 per MWh", and a 1 October 2026 government release says the Supercharger cuts electricity costs by "over £400 million per year" across industries including steel, chemicals, glass, paper and ceramics.

Who qualifies for the Supercharger?

Qualifying means holding an EII certificate. A 2023 government response says eligibility "involves a sector level test and a business level test and a firm must satisfy both". Within eligible sectors, "only those businesses whose electricity costs amount to 20% or more of their GVA go on to receive support" (GVA is gross value added). The same document said the government intended to review the analysis behind those criteria in 2026. In July 2025 the Department for Business and Trade estimated that around 500 firms would benefit from the network charge uplift.

The certificate comes from the department: "EIIs will apply to DBT for a certificate of exemption". The gov.uk application page says to "download the application forms and compensation calculation spreadsheets". Whether a particular firm is on the list is not something this guide can settle; the sector list and the forms are on that page.

What changed on 1 April 2026?

The Network Charging Compensation (NCC) scheme, run through Elexon, moved from 60% to 90%. Elexon says the scheme "initially offered Energy Intensive Industries (EIIs) 60% compensation on network charging costs for using the GB electricity grid; this has now been increased to 90%, taking effect from the claim month of April 2026". Three practical points follow from the government's response:

  • Compensation is paid in arrears: "eligible EIIs can expect their first uplifted compensation payments after April 2027".
  • Each claim window was extended to two months, starting with the window that opened on 30 June 2026.
  • Suppliers fund it. Elexon says the scheme "is funded by a levy on electricity suppliers", and the response says the levy "will be increased from 1 April 2027". The government "does not prescribe how suppliers recover these costs from their customers", but says it will "bear down on costs across the energy system" so that domestic and non-domestic consumers do not see a net increase from the measure.

What is the British Industrial Competitiveness Scheme?

BICS gives eligible manufacturers an exemption from the indirect costs of three existing schemes: the Renewables Obligation, Feed-in Tariffs and the Capacity Market. It does not include Contracts for Difference or network charges. The scheme "will apply in Great Britain only". The gov.uk scheme page says that from 2027 it will reduce electricity costs by "up to £40 per megawatt hour", and the release of 1 October 2026 says "up to 25 percent", with the percentage depending on the electricity price each company pays.

The exemption depends on legislation. DESNZ's note on the 2027 to 2028 Renewables Obligation level says the 100% exemption is "subject to the scheme having completed subsidy control procedures, and the legislation required to implement it having secured the necessary Parliamentary approvals". Businesses confirmed as eligible are also in line for "an additional lump-sum payment equivalent to around a year's relief", but "only those applying for BICS this year" can claim it.

DateFirst year of BICS
1 October 2026Application window opens
30 November 2026, 11:59pmApplication window closes
Early 2027Eligibility decisions
April 2027Exemption from Renewables Obligation and Feed-in Tariff costs starts
October 2027Capacity Market exemption starts as well

The guidance adds that "These dates apply to the first year of the scheme only".

Who can apply for BICS?

A business "must meet all 4" criteria: it is registered at Companies House, operates in an eligible sector, makes eligible products in Great Britain, and uses enough grid electricity at the site.

  • Sector. Frontier industries need electricity intensity "over 0.9%" and foundational industries "over 2.7%", measured by Standard Industrial Classification code.
  • Product. Goods are matched against Harmonised System codes. The government "does not intend to make any further changes to the code lists for 2027".
  • Usage. "each manufacturing site must consume at least 33 MWh of grid-supplied electricity per year". Only grid electricity counts.

Relief is calculated per site. A site making only eligible products "will normally receive a 100% exemption". Where products are mixed, the guidance sets three levels, based on the share of the site's electricity used for eligible manufacturing:

Share of electricity for eligible manufacturingExemption
25% or less0%
More than 25% but less than 50%50%
50% or more100%

How do the two schemes interact?

A firm can use both, but not on the same electricity: "a recipient cannot receive relief for the same activity under both schemes". Where an activity qualifies for both, the guidance says the Supercharger "generally provides a higher level of support than BICS". Its example: if a meter has a 70% Supercharger exemption and then receives a 100% BICS exemption, the BICS exemption "would apply only to the 30% of the meter not already exempted". Applicants are asked to list the meters, and the share of each, that the Supercharger already covers.

How do I apply?

  1. Supercharger. Apply to the department for an EII certificate using the forms on the gov.uk page, then register for the NCC Scheme service to claim network charge compensation.
  2. BICS. Use the department's eligibility checker, then gather the application documents. The guidance lists "electricity bills covering the most recent 6 consecutive months" for each site and a Companies House officer, or someone authorised, to complete the form. It warns "there will be no opportunity to amend an application after it has been submitted".
  3. Both. Say which meters the Supercharger already covers, so the department can set the final level of relief.

The non-commodity costs guide shows which bill lines these schemes remove, and the Climate Change Levy guide covers the separate levy reliefs. Reducing the units bought from the grid is the other lever, and the cost guide sets out what on-site equipment costs. Readers can send an enquiry about a site through the form on this page.

Sources and last checked

Guides on this topic

Common questions

Does BICS cover network charges?

No. BICS exempts eligible manufacturers from the indirect costs of the Renewables Obligation, Feed-in Tariffs and the Capacity Market. Compensation for network charges sits in the Supercharger's Network Charging Compensation scheme, for energy-intensive industries only.

Can a manufacturer with its own solar still apply?

Yes, but the on-site electricity does not count. The guidance says only grid electricity is eligible and tells applicants not to include electricity they generate from onsite sources such as solar panels, CHP or wind turbines.

Does BICS apply in Northern Ireland?

No, the scheme applies in Great Britain only. The government release says the Northern Ireland Executive will receive funding to implement an equivalent scheme, "subject to business case development", so that remains a proposal.

What if a firm misses the 30 November 2026 deadline?

The guidance says the dates apply to the first year of the scheme only, and the pages checked do not set out later windows. The lump-sum payment is limited to those applying this year, so the date matters.