Micro CHP for Business: When It Suits Hotels, Care Homes and Leisure Sites
Updated 23 October 2026 · Renewable Energy for Businesses
Weighing up CHP for your site?
Request a quoteMicro CHP is combined heat and power at the small end of the scale: an engine, fuel cell or similar unit that makes electricity on site and sends its heat to hot water, space heating or a pool. It earns its keep only where that heat is wanted for most of the year, which is why it comes up for hotels, care homes and leisure sites. This guide goes deeper than the general CHP guide and the wind and CHP solution page, on definitions, the heat match and the rules.
What counts as micro CHP?
Two numbers recur. The Energy Act 2004 defines microgeneration as plant with a capacity of no more than 50 kilowatts for generating electricity or 45 kilowatts thermal for producing heat, and gov.uk uses the same pair of numbers when it defines micro-CHP. Ofgem uses 50 kW for micro-CHP in the Smart Export Guarantee (SEG), against 5 MW for solar, wind, hydro and anaerobic digestion. The closed Feed-in Tariff used a much lower ceiling of 2 kW for micro CHP.
NetRegs describes packaged CHP units as starting at 50 kilowatts electrical (kWe), built on reciprocating engines, fuel cells or micro gas turbines, and usually designed to provide low grade heat of 70-90°C. That temperature suits domestic hot water, space heating and pool water better than high-temperature process heat.
Which sites suit micro CHP: hotels, care homes and leisure?
The test is whether the heat is used for most of the year. The Carbon Trust's Micro-CHP Accelerator (March 2011) found significant carbon savings in both domestic and non-domestic buildings, "particularly when the demand for heat is high and consistent". gov.uk describes the heat as supplied to an appropriately matched heat demand that would otherwise be met by a conventional boiler.
| Site | Why it can fit | What to check |
|---|---|---|
| Hotel | Hot water for rooms, kitchen and laundry, sometimes a pool or spa | Demand in the quietest months, not the busiest week |
| Care home | Hot water and heating that run day and night | Seasonal swing in heating, plant room space and flue route |
| Leisure centre or small pool | Pool water and hall heating needed most days | Closure periods and how much of the heat is truly constant |
A unit that stands idle for much of the year cannot recover its cost from heat nobody wants. The energy monitoring guide covers what to log before a size is chosen.
How much will a micro CHP unit produce?
Annual output is the unit's rated power multiplied by its running hours. NNFCC says biogas CHP engines typically turn 35-40% of fuel into electricity and 40-45% into heat, and gov.uk says CHP typically has an efficiency of over 80% overall. The table uses a hypothetical unit for illustration only: 20 kW electrical, 25 kW of heat and 35% electrical efficiency, so it burns 20 ÷ 0.35 = 57 kW of gas while running. A year has 8,760 hours.
| Running hours a year | Electricity (kWh) | Heat (kWh) | Gas burned (kWh) |
|---|---|---|---|
| 3,000 | 60,000 | 75,000 | 171,400 |
| 5,000 | 100,000 | 125,000 | 285,700 |
| 7,000 | 140,000 | 175,000 | 400,000 |
Two points follow. The unit only displaces imported power while the site draws at least its 20 kW at the same moment; anything beyond that is exported at the rate a supplier sets. And the heat is worth the gas it replaces only if it is used: a unit that runs for 7,000 hours against a heat load that exists for 3,000 would leave 100,000 kWh of heat with nowhere to go. The ratio of heat to power matters for the same reason. This unit gives 1.25 kWh of heat per kWh of electricity, and a site whose demand differs a lot from that ratio will either need boilers for the gap or waste the surplus.
Is it legal to generate your own electricity in the UK?
Yes, within limits, and small generators are covered by a standing exemption. Four sets of rules apply in practice.
- Licensing. Section 4 of the Electricity Act 1989 makes it an offence to generate electricity for the purpose of giving a supply to any premises unless authorised by a licence. Class A of the 2001 licence exemption order covers persons who do not provide more than 10 megawatts from any one generating station, so a unit of up to 50 kW is far inside it.
- Grid connection. The Energy Networks Association says a generator below 3.68 kW per phase falls under EREC G98 and one above it under EREC G99. Across three phases that is about 11 kW in total (3 × 3.68), so the 20 kW unit in the example above would sit on the G99 side of the line.
- Environmental permits. The specified generator rules apply to generators between 1 and 50 MW thermal, and to smaller ones with a capacity agreement or a balancing service contract. A unit of 50 kW or less is well below 1 MW thermal unless it has such a contract.
- Gas safety. HSE says work on gas fittings in workplaces such as shops, restaurants, schools and hospitals must be done by a qualified Gas Safe registered engineer, and it is illegal for anyone else.
What support and tax relief exist for micro CHP?
- Smart Export Guarantee. Micro-CHP up to 50 kW qualifies in Great Britain. The chosen licensee sets the payment terms, and Ofgem requires any tariff offered to stay above zero, so compare offers.
- Feed-in Tariff. Closed to new applicants from 1 April 2019.
- Climate Change Levy. The fuel exemption needs CHPQA certification. Whether the annual paperwork is worth it at this scale is a question for the numbers; the CHPQA guide sets out what is involved.
- Capital allowances. Enhanced capital allowances ended for companies on 1 April 2020.
How do you test whether it pays, and what should you ask a contractor?
- Collect a year of half-hourly electricity and gas or heat data and find the base heat load, the demand present in most hours.
- Take the unit's electrical and heat outputs and efficiencies from its datasheet, at full and part load.
- Estimate the hours a year in which all of its heat can be used.
- Work out the spread with your own prices, using the method in the spark spread guide.
- Deduct maintenance and capital recovery per kWh generated, then compare with a heat pump and solar for the same load.
On upkeep, gov.uk's operation and maintenance guide says that once a CHP package is installed it needs to be operated and maintained correctly if it is to deliver the planned savings. Ask a contractor for the service interval in running hours, what the maintenance price includes, how the site is heated while the unit is stopped, and who carries out the gas work. A reader can send an enquiry through the site's form to explore options for a site.
Sources and last checked
Every source below was checked on 22 October 2026. Rules change; the official pages are the authority if they disagree with this guide.
- Parliament, Energy Act 2004, section 82, and Electricity Act 1989, section 4, legislation.gov.uk, checked 22 October 2026.
- Government, The Electricity (Class Exemptions from the Requirement for a Licence) Order 2001, Schedule 2, legislation.gov.uk, checked 22 October 2026.
- Ofgem, Smart Export Guarantee (SEG): Generators and Feed-in Tariffs (FIT), checked 22 October 2026.
- DESNZ, Combined heat and power, updated 6 October 2020; Combined Heat and Power Incentives, updated 1 April 2019; CHP operation and maintenance, updated 15 February 2021, checked 22 October 2026.
- Energy Networks Association, Connecting generation to the electricity networks, checked 22 October 2026.
- Environment Agency and Natural Resources Wales, Specified generator: when you need a permit, updated 1 September 2022, checked 22 October 2026.
- HSE, Gas safety for employers, checked 22 October 2026.
- Carbon Trust, Micro Combined Heat and Power (CHP) Accelerator: Final report, March 2011, checked 22 October 2026.
- NetRegs, Different types of CHP systems for businesses, and NNFCC, Biogas, checked 22 October 2026.
Guides on this topic
Common questions
Is micro CHP renewable energy?
Not when it burns natural gas. gov.uk says CHP can reduce carbon emissions by up to 30% compared with separate generation by a boiler and a power station, but that saving comes from using the heat, not from changing fuel.
How many hours a year should a micro CHP unit run to be worthwhile?
No official source in this guide gives a single figure, because the answer depends on prices and the heat load. The practical test is the number of hours in which all of the unit's heat can be used. Work it out from your own data using the method in the spark spread guide.
Does a micro CHP unit need a CHPQA certificate?
Not to run. HMRC describes CHPQA as a voluntary programme. A certificate is needed only to claim CHP-specific tax treatment such as the Climate Change Levy exemption on fuel, so the question is whether that relief justifies the annual submission.
Is there a grant for micro CHP?
The schemes that used to pay for it have closed. The Feed-in Tariff, which allowed micro CHP up to 2 kW, closed to new applicants from 1 April 2019, and enhanced capital allowances ended for companies on 1 April 2020. What remains is the Smart Export Guarantee for exports and any Climate Change Levy relief available through CHPQA.