Biomass CHP for Business: When Wood-Fuelled Combined Heat and Power Fits
Updated 10 November 2026 · Renewable Energy for Businesses
Weighing up CHP for your site?
Request a quoteWhat is biomass CHP, and which technologies are there?
Biomass combined heat and power (CHP) burns or gasifies wood or other biomass to generate electricity, then uses the heat that would otherwise be wasted. The Agriculture and Horticulture Development Board (AHDB) names three types available: gasification, steam turbines and organic Rankine cycle (ORC) turbines. It says they vary considerably in technology, scale and the split between heat and electricity.
| Technology | How it works | Scale and outputs, as AHDB describes them |
|---|---|---|
| Gasification with an engine | Biomass is turned into a flammable gas that runs an internal combustion engine driving a generator | Typically small-scale, with about 2 units of heat for each unit of electricity |
| Steam turbine | A biomass boiler raises steam that drives a turbine; tried-and-tested technology using common components | Its smallest example pairs 200 kW of electricity with 2.5 MW of heat |
| Organic Rankine cycle (ORC) | Wood firing heats an organic oil, which vaporises to drive a turbine | Units from 200 kW of electricity up to 2 MWe each; about 17% electrical efficiency and about 5 units of heat per unit of electricity; heat leaves as water at 90°C |
Fuel separates them too: AHDB says gasification normally needs a clean fuel such as wood pellets, while steam plant is less sensitive to fuel quality and allows more choice of fuel and supplier. Its guide is written for growers and shows no date, so treat these figures as a starting point and ask for the performance data of the plant actually offered.
When does biomass CHP make sense?
Heat leads the decision. AHDB says the usual starting point for a cost-effective scheme is the heat requirement, because every type of biomass CHP produces more heat than electricity. So the case rests on using that heat through most of the year, which is why it tends to suit sites such as sawmills drying timber, food and drink plants running all week, and estates or campuses with a heat network. The CHP guide explains why running hours matter.
Check four things before going further:
- Temperature. ORC heat leaves at 90°C at most, which suits hot water and space heating but not a steam process.
- Electricity. How much of the output the site can use itself, and how much would be exported.
- Fuel logistics. Lorry access, storage space and a reliable supply for the plant's whole life.
- Emissions. The permits in the table below, and the effect on local air quality.
If the site has no use for the electricity, or its heat demand is seasonal, a heat-only biomass boiler is the simpler comparison; the biomass boiler guide covers fuel formats, smoke control and chimney rules. The wind and CHP page covers how on-site generation projects are assessed.
What support is left for biomass CHP?
- Renewables Obligation: closed. Ofgem says it closed to all new generating capacity on 1 April 2017.
- Renewable Heat Incentive: closed. The non-domestic scheme, which covered CHP systems, is closed to new applicants; the closed schemes guide explains what existing participants keep.
- Contracts for Difference. Renewable generators in Great Britain that meet the eligibility rules can bid in allocation rounds for a contract paying a flat indexed rate for their electricity. Rounds are now held every year; Allocation Round 8 is the latest on gov.uk, and its documents set out which technologies can apply.
- CHPQA certification. Good Quality certification still unlocks tax reliefs. The quality index is worked out from a scheme's overall efficiency, capacity and fuel types, and whether a scheme fully or partly qualifies sets how much Climate Change Levy and Carbon Price Support exemption its electricity gets. The CHPQA guide lists the reliefs.
- UK Emissions Trading Scheme. An installation burning only biomass is outside the scheme, and biomass-only units do not count towards its 20MW threshold; fossil fuel used only at start-up or shut-down does not change that. The UK ETS guide explains the scheme.
Which permits and rules apply?
| Trigger | What applies |
|---|---|
| Under 1MW thermal input | No medium combustion plant permit, but smoke control and chimney height rules can apply (see the biomass boiler guide) |
| Each unit from 1MW to under 50MW thermal input, any fuel | A medium combustion plant permit with limits on nitrogen oxides, sulphur dioxide and dust; a new plant needs it before commissioning |
| Existing plant (first run before 20 December 2018) | Permit by 1 January 2024 if over 5MW, or by 1 January 2029 if 1MW to 5MW |
| The plant also generates electricity | The specified generator rules can apply as well |
| 50MW thermal input or more | An A1 installation permit instead |
| Burning waste wood | Clean, untreated waste biomass below 3 tonnes an hour: a Part B permit; 3 tonnes an hour or more: Part A1; contaminated waste wood: a small waste incineration plant under the waste incineration rules |
| Supplying heat to more than one building | Possibly a heat network, which Ofgem regulates in Great Britain |
| Planning (England) | Planning practice guidance lists grid connection, site size and, for biomass, transport links among the siting considerations |
The permitting guidance quoted here applies to England and Wales; in Scotland ask the Scottish Environment Protection Agency, and in Northern Ireland the Northern Ireland Environment Agency.
What fuel standards and store safety rules apply?
Specify fuel against a standard. BS EN ISO 17225-2 sets quality classes for graded wood pellets, and BS EN ISO 17225-4 does the same for graded wood chips. BSI says the chip standard supports small and medium residential, commercial and public building applications, and recommends ISO 17225-1, or the draft ISO 17225-9, for industrial plant over 5 MW. It adds that tolerances differ with the energy conversion technology, which matters here: a gasifier needs cleaner fuel than a steam boiler. The biomass boiler guide covers moisture, storage and the Biomass Suppliers List.
Fuel stores need their own risk controls. HSE warns of a risk of death from carbon monoxide in wood pellet storage, and recommends ventilating stores at all times and checking carbon monoxide and oxygen levels with a suitable device before anyone enters. In England and Wales the fire risk assessment the Regulatory Reform (Fire Safety) Order 2005 requires should cover the fuel store and its feed system.
What should you ask a developer or supplier?
- Heat data. What a year of measured heat demand shows, by hour and by temperature, and what the plant was sized on.
- Technology. Why this type, its heat-to-power ratio, electrical output and the temperature of the heat it delivers.
- Quality. The expected CHPQA quality index and power efficiency at realistic heat use, and who will act as Responsible Person.
- Availability. Expected running hours a year, planned outages and the back-up heat source.
- Fuel. The ISO 17225 class specified, contract length, delivery logistics and store size.
- Ash and maintenance. How much ash the plant produces, where it goes, and the maintenance regime.
- Consents. Which permit applies, the emission limits, who applies and how long it takes.
Where the heat will serve other buildings, the scheme may be a heat network. Ofgem defines one as supplying heating, cooling or hot water to more than one property in a building, or to more than one building, from a central source, and says operators and suppliers of relevant heat networks must register with it by 26 January 2027. The heat network guide explains the rules. Readers can send details of a site through the enquiry form on the wind and CHP page.
Sources
All checked 10 November 2026.
- AHDB (no date shown): Biomass combined heat and power (CHP); Biomass CHP: gasification; Biomass CHP: steam turbine; Biomass CHP: ORC turbine.
- DESNZ: CHPQA programme (2 September 2025); Contracts for Difference (16 December 2025); CfD Allocation Round 8 (1 June 2026).
- GOV.UK: Non-domestic Renewable Heat Incentive.
- Ofgem: Renewables Obligation; Heat networks.
- Environment Agency, Natural Resources Wales, Defra and Welsh Government: Medium combustion plant: when you need a permit (9 July 2025).
- Environment Agency and Defra: Part B activities: combustion and incineration permits (9 July 2025).
- MHCLG: Renewable and low carbon energy, planning practice guidance (14 August 2023).
- legislation.gov.uk: Greenhouse Gas Emissions Trading Scheme Order 2020, Schedule 2; Regulatory Reform (Fire Safety) Order 2005, article 9; article 1 (extent).
- BSI Knowledge: BS EN ISO 17225-2:2021, graded wood pellets (30 June 2021); BS EN ISO 17225-4:2021, graded wood chips (31 March 2021).
- HSE: Storage of wood pellets: risk of death from carbon monoxide, bulletin OPSTD 3-2012 (5 November 2012).
Common questions
Does a biomass CHP plant need a UK ETS permit?
Not if it burns only biomass: the 2020 Order puts an installation that uses only biomass outside the scheme, even if it uses fossil fuel at start-up or shut-down. A site that also burns fossil fuels on other units must add those units up against the 20MW threshold.
Can a biomass CHP plant burn waste wood?
Only under the waste rules. Clean, untreated waste biomass burned at under 3 tonnes an hour needs a Part B permit, 3 tonnes an hour or more is a Part A1 activity, and contaminated waste wood makes the plant a small waste incineration plant under the waste incineration rules.
How small can biomass CHP be?
AHDB describes gasification systems as typically small-scale, and ORC units as suitable for plants with an electrical output as small as 200 kW, with single units up to 2 MWe. For more output, it says several ORC units can be installed together.
Can a new biomass CHP plant still get Renewables Obligation or RHI payments?
No. Ofgem says the Renewables Obligation closed to all new generating capacity on 1 April 2017, and the non-domestic Renewable Heat Incentive is closed to new applicants. Contracts for Difference and CHPQA tax reliefs are the routes to check.