Which schemes have closed, and when?

Both schemes paid for energy a business generated, and both are now shut to new entrants. The dates below come from Ofgem, which administers them.

SchemeWhat it paid forClosed to new applicants
Non-domestic RHI (Great Britain)Renewable heat, by the amount of eligible heat generated31 March 2021. Some applicants with extended commissioning deadlines had until 31 March 2023
Feed-in Tariff (FIT)Solar PV, wind, micro CHP, hydro and anaerobic digestionFrom 1 April 2019

Ofgem's own scheme page records that after the final extension the RHI closed to all new applications for accreditation on 31 March 2023. What remains open is re-accreditation after an installation is replaced, relocated or sold. Northern Ireland ran a separate RHI, which its Department for the Economy suspended to new applicants on 29 February 2016. The SEG applies only in Great Britain, so the Northern Ireland export payments guide covers what applies there.

What do existing participants keep?

Closure does not stop payments to installations that are already accredited. Ofgem says FIT support stays payable for the installation's eligibility period, typically 20 years, and RHI participants can be paid for up to 20 years while they keep meeting the scheme's requirements. Five details matter to anyone running or inheriting a site.

  • Indexation. RHI tariffs rise each year, by RPI for applications made before 1 April 2016 and by CPI after that. FIT tariffs followed RPI up to FIT Year 16, but gov.uk confirmed that from April 2026 they are adjusted in line with CPI, starting with the 2026 to 2027 FIT year.
  • RHI obligations. Participants give meter readings every quarter (monthly above 1 MWth), sign an annual declaration and keep meters re-calibrated or replaced at least every 10 years. Ofgem can withhold payments if it believes the rules are not being met.
  • FIT obligations. Generators stay bound by their statement of FIT terms. That includes telling the FIT licensee when a battery is connected, a meter is replaced or moved, equipment is replaced or capacity is added.
  • Batteries and EV chargers. Adding them to a FIT site does not affect payments as long as the generation, and any metered export, can still be measured accurately.
  • Extensions. Extra capacity added to a FIT installation earns no FIT payments unless it was commissioned before 15 January 2016. Where a meter records both accredited and non-accredited capacity, payments are prorated.

What happens if the business or building is sold?

The payments follow the accredited installation, and each scheme has its own transfer route.

  • RHI. If a business with an accredited heating system is sold, the new owner can apply to receive the payments due for the rest of the tariff term and has 12 months from the date of sale to notify Ofgem. The old owner has 28 days to submit a change of ownership form. A replaced or relocated installation needs re-accreditation, and payments stop until Ofgem confirms it still meets the criteria.
  • FIT. The FIT generator who receives the payments is sometimes not the property owner, as in rent-a-roof arrangements. The new owner of a smaller MCS-FIT installation (solar PV or wind up to 50 kW, or micro CHP) contacts the FIT licensee. The new owner of a ROO-FIT installation (solar PV or wind above 50 kW, plus all hydro and anaerobic digestion) first updates the Renewable Electricity Register. Ofgem says it can tell someone who has moved into a property whether solar panels are registered on the FIT scheme and with which licensee, so a new occupier can check.

What replaced them for new projects?

Nothing now pays per kWh of heat or generation in the way the old schemes did. Support comes from three directions, plus tax relief for the capital cost.

  • Export income: the Smart Export Guarantee (SEG). It launched on 1 January 2020 and covers solar PV, wind, micro CHP, hydro and anaerobic digestion up to 5 MW (50 kW for micro CHP) in Great Britain. Each licensee sets its own rate and contract length, but the rate must always be above zero, and a generator can apply to any licensee, not only its current supplier. A FIT generator cannot receive both SEG and FIT export payments for the same electricity and must opt out of FIT export payments first.
  • Small heat systems: the Boiler Upgrade Scheme (BUS). Open in England and Wales, and usable for a heating system in "a building used for your business". Gov.uk gives £7,500 towards an air source or a ground source heat pump, or £9,000 until March 2027 where the property is heated by oil or LPG and has no mains gas connection. The maximum capacity is 45 kWth for an individual system. A property already given government funding or support for a heat pump or biomass boiler cannot claim, so a site with an RHI-supported system should check before assuming it can.
  • Biomethane: the Green Gas Support Scheme. It supports new anaerobic digestion plants that inject biomethane into the gas grid. Ofgem says new stage 1 applications close on 31 March 2028 and participants are paid quarterly for up to 15 years. The green gas guide explains the market.

The capital cost of a heat pump, solar array or CHP unit is relieved through tax rather than a tariff. The enhanced capital allowances guide explains what replaced the old energy-saving relief, and the commercial heat pump page covers the technology.

What are the main subsidies for renewable energy in 2026?

For a private-sector business, four routes matter most. Capital allowances relieve the cost, with the annual investment allowance covering up to £1 million. The SEG pays for exports. The Boiler Upgrade Scheme part-funds small heat systems. The Workplace Charging Scheme part-funds EV sockets: its grant covers up to 75% of the cost, with a cap per socket that gov.uk says rose from £350 to £500 from 1 April 2026, and gov.uk records the scheme as extended for a final year until 31 March 2027.

Public-sector and devolved routes differ. The grants and funding page keeps the current status of each scheme, and the renewable energy grants guide covers how they combine. For help with bills rather than capital, see the business energy bills guide. Readers who want to discuss a particular site can send an enquiry through the form on this page.

Sources and last checked

Common questions

Can a business still apply for the non-domestic RHI?

No. Ofgem records that the scheme closed to new applicants on 31 March 2021 and, after the final commissioning extension, to all new applications for accreditation on 31 March 2023. The only applications now are re-accreditations after an installation is replaced, relocated or sold.

Can a site on the Feed-in Tariff also claim the SEG?

For the same electricity, not both. Ofgem says most accredited FIT installations are eligible for the SEG with a smart or export meter, but the generator must first opt out of FIT export payments by contacting the FIT licensee. Compare the SEG rates on offer with the current FIT export payment before switching, and note that opting out of export payments is not the same as leaving the scheme: Ofgem warns that an installation removed from the Central FIT Register cannot rejoin.

Does an RHI-accredited heat pump rule a site out of the Boiler Upgrade Scheme?

Possibly. Gov.uk lists a property that has already been given government funding or support for a heat pump or biomass boiler among those that cannot get a grant. Check the position with the scheme before assuming an RHI site can also claim.

Are Feed-in Tariff payments still linked to inflation?

Yes, but the index changed. Ofgem says tariffs followed RPI up to FIT Year 16, and gov.uk confirmed that from April 2026 they are adjusted annually in line with CPI.