Selling Exported Power in Northern Ireland, Where SEG Does Not Apply
Updated 23 October 2026 · Renewable Energy for Businesses
Planning solar panels for your building?
Request a quoteA Northern Ireland business that generates more than it uses is paid for the surplus under different arrangements from Great Britain. This guide covers the rate Power NI publishes for 2026/27, who sets it, what larger sites do, how export is metered, and what NIE Networks requires before a system can export. Power NI's agreements name wind, hydro and solar, and NIE Networks sets its connection routes by capacity. The broader funding picture is on the grants and funding page.
Why does SEG not apply in Northern Ireland?
Ofgem says Smart Export Guarantee (SEG) installations must be located in Great Britain, so a Northern Ireland site cannot join it. In Northern Ireland the grid operator does not buy export at all: NIE Networks says it connects the system, and electricity suppliers buy what is exported. The Utility Regulator adds that micro-generators can sell either directly to a supplier or through an agent.
| Point | Great Britain (SEG) | Northern Ireland |
|---|---|---|
| Who sets the terms | SEG Licensees set the rate, contract length and other terms, and the rate must be above zero | Set in each supplier's export contract. Power NI's microgeneration price is approved by the Utility Regulator each year |
| Size covered | Up to 5MW, or 50kW for micro-CHP | Power NI's annual price covers generators up to 50 kW |
| How export is measured | Export meter readings | Actual meter reads, since 1 October 2022 |
What does Power NI pay for exported electricity in 2026/27?
Power NI's tariff page lists an export rate of 11.88 pence per kWh for 1 October 2026 to 30 September 2027. It says the tariff for renewable generation is approved by the Utility Regulator each year, that the export tariff year runs from 1 October to 30 September, and that new rates are published towards the end of September. Its help page describes this as one price set annually for export generators up to 50 kW.
Payments go to the generator's bank account, separate from the electricity supply bill. Power NI says export payments are made in late October each year for most customers, so for most customers the payment is annual.
A new system earns export income only. Power NI states that the government ROC scheme closed in March 2017 and that only installations accredited before closure can claim ROCs. Other suppliers may offer their own terms, and this guide found no published export rates from them to compare. Ask each supplier for its terms in writing before signing.
What if the site is above 50 kW?
Power NI also offers power purchase agreements (PPAs), the route to look at for larger generators. Its PPA page says it provides PPAs for wind, hydro, landfill gas or solar, and that it has experience of systems from 2kW to 30MW. It explains that wholesale electricity on the island of Ireland is governed by the Integrated Single Electricity Market, that payments can reference the Day Ahead Market or the Balancing Market, and that whichever reference price applies, generators are paid monthly. Different options may be offered depending on the technology and the generator's requirements.
That monthly, market-linked pricing is a different risk profile from a price set once a year. A site close to 50 kW should price both routes before fixing system size. The wind speeds guide covers the resource side for turbines.
How is export measured, and what changed in 2022?
On 31 May 2022 the Utility Regulator published a decision to use actual meter reads and remove the "deemed" solution, under which micro-generators were deemed to have exported 45% on average of the electricity they produced. The new settlement period took effect on 1 October 2022. Export is now what the meter records.
Power NI asks generators to submit meter readings when requested, to photograph the reading at the time, and to tell it about changes to the system as soon as they occur. NIE Networks fits an import/export meter after a G98/NI system is commissioned if the site does not already have one.
What does NIE Networks require before a system exports?
| Route | Size | How it works |
|---|---|---|
| G98/NI | Up to 3.68 kW single phase, under 11.04 kW three-phase, or under 16 amps per phase | "Fit and Inform": the installer commissions, then has 30 days to submit the Stage 1 form. No application fee for Stage 1 |
| G99/NI Fast Track | Up to 60 amps per phase, inverters up to 32 amps per phase, export limited to 16 amps per phase | Approval before installation, with an application fee |
| G99/NI | Above the Fast Track limits | Approval before installation, an application fee and a place in a generation queue |
NIE Networks says the Fast Track parameters changed on 1 May 2026, when the ceiling rose from 16 amps per phase to 60, with the export limit staying at 16. For G99/NI applications seeking export for permitted development, planning evidence is due 120 calendar days after the offer, and the connection works must finish within a longstop 24 months after the scheduled completion date, or export capacity can be retracted.
Capacity is local. NIE Networks publishes a capacity map showing available network capacity for generation, and on its G99/NI page it noted that after upgrade works it would accept generation export applications at Limavady Main Substation from 15 September 2026, under temporary rules. Wind farm operators follow a separate settings schedule to stay within the Grid Code. NIE Networks describes its G99/NI rules by capacity, with solar panels and wind turbines as examples.
For help with funding that sits alongside export income, see the Invest NI energy support guide and the Northern Ireland page. To see how export income might look for a particular site, send an enquiry through the enquiry form, and see the grants and funding page for other routes.
Sources and last checked
All sources were checked on 22 October 2026. Tariffs reset each October, so the Power NI page is the authority if it differs from this guide.
- Smart Export Guarantee (SEG), Ofgem, checked 22 October 2026 (no date shown)
- Renewable Prices and Tariffs, Power NI, rates for 1 October 2026 to 30 September 2027, checked 22 October 2026
- Microgeneration, ROCs and Export, Power NI, checked 22 October 2026 (no date shown)
- Why does Power NI change the ROC and export price each year?, Power NI, checked 22 October 2026 (no date shown)
- When can I expect to receive my export payment?, Power NI, checked 22 October 2026 (no date shown)
- Power Purchase Agreements, Power NI, checked 22 October 2026 (no date shown)
- Decision on the generation and export of electricity by micro-generators published, Utility Regulator for Northern Ireland, 31 May 2022
- G98/NI Installations, NIE Networks, checked 22 October 2026 (no date shown)
- G99/NI Fast Track Installations, NIE Networks, checked 22 October 2026 (no date shown)
- G99/NI Installations, NIE Networks, checked 22 October 2026 (no date shown)
Common questions
Can a Northern Ireland business be paid through a Great Britain supplier's SEG tariff?
No. Ofgem says SEG installations must be located in Great Britain. A Northern Ireland site needs an export contract with a supplier, and NIE Networks says it has no involvement in that step.
Does the Power NI export price change during the year?
Power NI sets an annual price: the export year runs from 1 October to 30 September, and new rates are published towards the end of September. Power NI also says prices are subject to fluctuation each year, so next year's rate may differ from 11.88 pence per kWh.
Can a new system claim ROCs?
No, going by Power NI's page. It says the government ROC scheme closed in March 2017 and that only installations accredited before closure are eligible to claim ROCs. A new installation is paid for export alone.
Does NIE Networks buy the electricity a site exports?
No. NIE Networks says it connects a system to the grid but does not buy the electricity, and that electricity suppliers buy what is exported. It says the installer will usually arrange the export contract with a supplier.