Request a quoteSupport for business energy projects in Northern Ireland differs from the picture in guides written for Great Britain. Invest NI's main energy grant is paused, a regulator-run programme covers some non-domestic work, and the rating rules for on-site generation differ from England. This guide takes each as the official pages stood on 22 October 2026. The wider UK picture is on the grants and funding page.
Is the Invest NI Energy Efficiency Capital Grant open?
No. Invest NI's page says the Energy Efficiency Capital Grant (EECG) launched in April 2024 and that, after one year of operation, it paused the scheme to review its performance. It says it intends to reopen the scheme once a full assessment is complete, and that it is not currently accepting enquiries or applications. The page gives no reopening date and offers a newsletter sign-up for news of one.
At launch, on 8 May 2024, the Department for the Economy described a £20 million, five-year fund offering grants of up to £150,000 for areas such as lighting, heating and cooling equipment, motors and drives, compressed air and on-site renewable generation. That describes the launch, not today's position.
| Item | What Invest NI's page recorded while the scheme ran |
|---|---|
| Applicant | A registered company based in Northern Ireland, trading for at least 2 years, registered for business rates at the project premises, and owning them or holding a long-term rental agreement |
| Funding capacity | Able to show sufficient funds to cover a reimbursement grant |
| Project | Eligible spend of at least £4,000, and a payback of between 1 and 8 years |
| Limits | Up to 3 projects at one site per application, and one entity per company group |
| Excluded | Sports clubs and organisations, charities and farms |
| Funding source | Part-funded by the UK government through the UK Shared Prosperity Fund |
The page warns that business eligibility criteria may change after the review. It does not state grant rates by company size, which sit in guidance notes that this guide could not read (the page dates them 26 April 2024), so check any percentage quoted elsewhere against those notes. What happened to the fund behind it is covered in the UKSPF guide.
What does Invest NI offer while the grant is paused?
Invest NI's reduce waste and save energy page lists other routes alongside the EECG. Technical consultancy is for businesses spending over £30k a year on energy and resources; the consultancy page says it is open to any Northern Ireland business with annual energy and resource spend above £30,000, and that Invest NI funds a bespoke project and appoints a specialist consultant. It offers nine specialist areas, one of which covers all types of renewable energy systems. Carbon and Sustainability Reports use the same £30k threshold. A Resource Efficiency Capital Grant of up to £50k is for water, raw materials or waste, and for Invest NI clients, so it is not an energy grant.
Neither page gives an open or closed notice or a date. The reduce waste page notes that some programmes are only available to Invest NI clients, so check each programme's own eligibility.
What is NISEP and can a business use it?
The Northern Ireland Sustainable Energy Programme (NISEP) is run by the Utility Regulator. On 1 April 2026 the regulator said it had approved NISEP schemes for 2026/2027. Power NI's 2026/27 commercial scheme has closed for applications; Power NI expects the next round to open in April 2027, subject to funding approval. It describes NISEP as an energy efficiency programme for domestic and non-domestic customers, with at least 80% of funding going to vulnerable or priority customers. Non-priority schemes cover various measures for domestic, non-domestic and innovative projects, and 11 Scheme Managers deliver the programme.
A business contacts the relevant Scheme Manager for details. The regulator warns that grants are allocated first come first served, so a scheme may be oversubscribed and have a waiting list. For the future, the regulator published a NISEP Framework Document for 2027/2029 and a Call for Schemes on 8 October 2026. Scheme submissions close on 15 December 2026 and applicants will be told in March 2027, so what NISEP offers from 2027 is not yet known.
How are on-site renewables treated for business rates in Northern Ireland?
England's exception for on-site renewable plant comes from SI 2022/405, which amends the English plant and machinery regulations. Northern Ireland has its own rules. The Department of Finance's valuation practice note, written for the revaluation whose list took effect on 1 April 2023, says plant generating electricity with an installed capacity of 50kW or less is not rateable under the Rates (Microgeneration) Order (NI) 2012. Above that, a hereditament with generation is rateable under the same Order.
The note adds that where power is mainly or exclusively for self-consumption, the plant is valued with the hereditament, for example a factory with rooftop solar, provided it is not classed as microgeneration. Wind farms and turbines have a separate practice note. So system size around 50kW can change a rates bill, and is worth checking before design is fixed.
What does not apply in Northern Ireland?
| Scheme or rule | Position |
|---|---|
| Smart Export Guarantee (SEG) | Installations must be located in Great Britain, so exports are sold to a supplier instead (see the export payments guide) |
| Boiler Upgrade Scheme | Open to people in England and Wales; gov.uk says the Boiler Replacement Scheme in Northern Ireland is now closed |
| England's on-site renewables rates exception | SI 2022/405 amends the English regulations |
| Freeport and Investment Zone tax sites | None listed for Northern Ireland; gov.uk describes an Enhanced Investment Zone backed by £150 million, usable across spending and tax levers (see the tax sites guide) |
For the Scottish equivalent, see the Business Energy Scotland guide.
Where should a Northern Ireland business look first?
- Check the EECG page for a reopening notice, and use its newsletter sign-up.
- If energy and resource spend is above £30,000 a year, read the technical consultancy and carbon report pages.
- Ask NISEP Scheme Managers which 2026/2027 schemes cover non-domestic work.
- Work out export income and the connection route before sizing a system.
- Check the rating treatment, especially near 50kW.
Regional context is on the Northern Ireland page. To see which routes might fit a particular site, send an enquiry through the enquiry form, and keep the grants and funding page to hand for the UK-wide tax reliefs.
Sources and last checked
All sources were checked on 22 October 2026. Schemes open, pause and close, so the official page is the authority if it differs from this guide.
- Energy Efficiency Capital Grant, Invest NI, checked 22 October 2026 (no page date; guidance notes dated 26 April 2024)
- Reduce waste and save energy, Invest NI, checked 22 October 2026 (no date shown)
- Technical Consultancy support, Invest NI, checked 22 October 2026 (no date shown)
- £20million energy support fund for businesses, Department for the Economy, published 8 May 2024
- Northern Ireland Sustainable Energy Programme list of schemes for 2026/2027 published, Utility Regulator, 1 April 2026
- NISEP Framework Document 2027/2029 and Call for Schemes, Utility Regulator, 8 October 2026
- Renewable energy (Non Domestic Valuation practice notes), Department of Finance, checked 22 October 2026 (no date shown; list effective 1 April 2023)
- Apply for the Boiler Upgrade Scheme, GOV.UK, checked 22 October 2026 (no date shown)
- Smart Export Guarantee (SEG), Ofgem, checked 22 October 2026 (no date shown)
- The Valuation for Rating (Plant and Machinery) (England) (Amendment) Regulations 2022, legislation.gov.uk, made 29 March 2022
- Investment Zones in England, MHCLG (GOV.UK), last updated 15 April 2026
Common questions
When will the Energy Efficiency Capital Grant reopen?
Invest NI's page gives no date. It says it intends to reopen the scheme once a full assessment is complete and that it will let applicants know when that is due. Its newsletter sign-up is the route it names for news of a reopening.
Did farms and charities qualify for the grant?
No. While the scheme ran, Invest NI's page excluded sports clubs and organisations, charities and farms. The page adds that business eligibility criteria may change following the programme review, so a reopened scheme could differ.
Does a business need to be an Invest NI client for technical consultancy?
The consultancy page says the support is open to any Northern Ireland business with annual energy and resource spend above £30,000. Invest NI's wider page notes that some programmes are only for clients, such as the Resource Efficiency Capital Grant, so each programme's rules need checking.
Is NISEP only for households?
No. The Utility Regulator describes it as an energy efficiency programme for domestic and non-domestic customers. At least 80% of the funding is reserved for vulnerable or priority customers, so the non-priority share that businesses draw on is smaller.