Corporate PPAs Explained: On-site, Sleeved and Virtual Power Purchase Agreements

Updated 20 October 2026 · Renewable Energy for Businesses

Want to cut what your site uses and pays for energy?

Request a quote

What is a corporate PPA?

A power purchase agreement is a long-term contract to buy electricity from a generator. When a utility or trader buys the power to resell it, that is a utility PPA. When the buyer is a business that uses the electricity itself, it becomes a corporate PPA, which the government describes as a long-term electricity purchase agreement between a generator and a corporate electricity user.

They remain a small part of the market. A call for evidence published in January 2026 by the Department for Business and Trade and the Department for Energy Security and Net Zero said few formal statistics exist, but corporate PPAs are believed to represent 2.5% to 5% of the British power trading market. Typical terms are 10 to 15 years. How the price moves over that time is negotiated, usually by indexing to the Consumer Price Index, though some contracts use fixed annual escalators instead.

In the government's July 2026 response, respondents valued long-term price certainty most.

What are the three types of corporate PPA?

TypeWhere the power comes fromHow it reaches you
On-site or private wireA generator on your premises or nearbyA private connection behind your meter
Sleeved or unsleevedA generator elsewhere on the gridOver public networks, usually managed by a licensed supplier
Virtual or financialA generator that may be anywhereIt does not: the contract is a price hedge only

On-site and private wire

Here the generator sits on your site, such as solar panels on your roof, or close by and connected to you by a private cable. The government notes that these arrangements involve some capital investment in infrastructure, but can be cost effective because being behind the meter reduces exposure to network costs and levies. Respondents saw them as the most cost competitive structure, though proximity, land and tenancy constraints make them hard to deploy at scale.

Check the licensing position too. A third party selling you the output of a generator on your site is supplying electricity. Government guidance explains that the Class A small supplier exemption lets generators supply their own output without a supply licence, up to 5 MW of which no more than 2.5 MW can go to domestic consumers, and that operating without a licence or valid exemption is an offence. The contract should say which exemption applies.

Sleeved and unsleeved

When the generator is elsewhere, the power travels over the public network. A third party, usually a licensed supplier, manages the sleeving: grid access, payment of access charges and levies, and other services for a fee. It often acts as your back-up supplier and tops up your electricity if the project cannot deliver enough. Sleeving is the most common route in Britain, though some respondents said it can involve hidden costs and complexity. A smaller set of deals are unsleeved, with the buyer or the generator handling those tasks directly.

Virtual or financial

No electricity changes hands. The two sides agree a benchmark price and money moves between them as the market rises above or falls below it, hedging both against price swings. RE100's criteria note that a buyer with a financial PPA must still procure its electricity separately. The call for evidence left these contracts out of scope as hedging instruments rather than supply contracts, and respondents asked for the accounting, reporting and collateral barriers to be addressed.

Who can realistically sign one?

The call for evidence put it plainly: only businesses able to commit to buying a substantial volume of electricity over an extended period are likely to secure a corporate PPA. Four hurdles come up again and again:

  • Load shape. Wind and solar output does not closely match typical business demand, which can create imbalance costs and complex shaping clauses.
  • Credit. A developer financing a new project needs a buyer whose covenant it can bank on, which in practice limits long-term deals for new assets to larger buyers with robust creditworthiness. Some buyers can buy credit insurance, for a fee that reflects the risk.
  • Time and expertise. Each contract tends to be bespoke, and negotiations lasting around six months are not unusual.
  • Risk appetite. A long commitment can be unattractive to businesses with a low tolerance for risk or narrow margins.

For smaller users, respondents said minimum volumes and transaction costs remain a significant barrier, and several argued for pooled or multi-buyer deals. Shorter contracts may also widen access: projects leaving the Renewables Obligation from 2027 may look for agreements of 1 to 10 years to fund refurbishment or repowering. If your demand is modest, an on-site arrangement on your own roof or land is often the more practical place to start, and the PPA and procurement guide compares it with owning the equipment. For the numbers, the funding guide sets out how to compare a PPA with buying or financing on cost, cash flow and tax.

How is a corporate PPA priced?

There is no reliable typical price, so any figure should come from a proposal built on your own half-hourly data. What you can compare in advance is the structure:

  • Pay as produced. You buy all, or a set share, of what a named project generates and top up the rest through a normal supply contract. Industry commentary suggests this is the most widely used model for wind and solar.
  • Baseload or fixed profile. The generator promises a set volume or shape of delivery and carries the volume risk, which typically leads to higher pricing.
  • Indexation. Inflation-linked prices protect the generator, while set annual escalators give you a known path.
  • Non-commodity costs. Network charges, balancing and policy levies can be a large share of a bill. Respondents said these are typically unchanged under grid-delivered deals, which is why private wire and on-site arrangements, which avoid many of them, are seen as the most cost competitive.

Generators also weigh a corporate deal against government Contracts for Difference, which generally run for 15 to 20 years. Corporate buyers are rarely willing to commit for that long, and even large, reputable companies cannot match the security of a sovereign-backed contract.

What can you claim about carbon?

A physical corporate PPA links your purchase to a named low-carbon project. The government says that gives a higher degree of demonstrable additionality than buying certificates alone and can support Scope 2 emissions reporting, and respondents saw a direct contractual link to a named asset as more credible than unbundled certificates.

Certificates still matter. Ofgem issues one REGO certificate per megawatt hour of eligible renewable output, but REGOs can be traded separately from the electricity they certify and tend to trade at relatively low value. If your PPA bundles certificates with the power, confirm they transfer to you. If you report to RE100, note its fifteen-year commissioning limit: on-site and direct-line PPAs are exempt, and long-term deals where you are the original buyer can also qualify for exemption.

What are the main risks?

  • Price lock-in. If wholesale prices fall, an agreed long-term price can leave you paying more than the market.
  • Counterparty risk. The generator relies on your credit for a decade or more, and you rely on the project being built and run as promised.
  • Delivery delays. Delays to a new-build project can disrupt supply and add cost.
  • Occupancy. An on-site deal outlives many leases, so assignment, buy-out and removal terms need agreeing before signing.

Policy may shift too. Most respondents asked government to take on part of generators' counterparty risk, and many wanted voluntary standard terms to cut legal costs, but the July 2026 response records those requests rather than announcing measures and says the government welcomes further engagement. Do not price in support that does not exist yet. Compare a PPA with buying or financing the same kit using the asset finance guide, check where procurement sits in your net zero roadmap, and see the PPA procurement page for how the routes compare. You can request quotes through the quote form and ask for each structure to be modelled on your own data.

Sources

  • Department for Business and Trade and Department for Energy Security and Net Zero, Corporate Power Purchase Agreements call for evidence (January 2026) and government response (updated 7 July 2026), checked 20 October 2026.
  • Department for Energy Security and Net Zero, Electricity generation, distribution and supply licence exemptions FAQs (revised September 2026), checked 20 October 2026.
  • Ofgem, REGO scheme page, checked 20 October 2026.
  • RE100 (The Climate Group), RE100 technical criteria (April 2025), checked 20 October 2026.

Guides on this topic

Common questions

Can a small business sign a corporate PPA?

Grid-delivered deals are hard to reach, because generators look for substantial volumes, strong credit and long terms. Pooled or multi-buyer deals are being discussed as a way in. For most smaller firms, an on-site arrangement is the more practical starting point.

Does a corporate PPA make all of my electricity renewable?

Not usually. Under a pay-as-produced deal you buy a project's output when it generates, which covers only part of your consumption, and the rest comes from a top-up supply contract. Your carbon reporting depends on which certificates and attributes transfer to you, so check that in the contract.

How long does it take to agree a corporate PPA?

Government evidence says negotiations of around six months are not unusual, because each contract tends to be bespoke. On-site arrangements depend more on surveys, connection approval and lease consent.

What happens to an on-site PPA if we move out of the building?

That depends entirely on the contract. Look for clear terms on assigning the agreement to a new occupier, buying out the equipment at an agreed price, or having it removed. Agree these with your landlord and the funder before signing, because the agreement may run longer than your lease. From the landlord's side, see the guide to landlord consent and green lease terms.