Reformed National Pricing: What Electricity Market Reform Means for Business Bills
Updated 23 October 2026 · Renewable Energy for Businesses
Want to cut what your site uses and pays for energy?
Request a quoteReformed National Pricing (RNP) is the government's name for keeping one wholesale electricity price for Great Britain while reforming the market around it. The same national wholesale price applies to every business. What may change, over several years, is how network, constraint and balancing costs are driven and shared, and much of that is still at proposal stage. The guide to non-commodity costs explains the bill lines these reforms would touch.
What did the government decide in July 2025?
On 10 July 2025 the Department for Energy Security and Net Zero (DESNZ) published the summer update of its Review of Electricity Market Arrangements (REMA). The review had been weighing two broad approaches. Zonal pricing would split the wholesale market into several zones across Great Britain. Reformed national pricing would keep a single national price and add reforms around it.
The update chose the second. It says the government decided "to retain a single national GB-wide wholesale market and introduce an ambitious package of reform", and "therefore decided not to implement zonal pricing". It adds that the reforms are designed to deliver fair outcomes for household and business consumers.
Why was zonal pricing rejected?
The update gave four reasons, each tied to a cost or risk that would eventually reach bill payers.
- Weaker investment signals. Under zonal pricing, the signal for new renewable generators would depend on volume risk that "fluctuates on a half hourly basis". Investors would have to project sales into a zonal market that does not yet exist.
- Fairness between regions. Zonal pricing "would mean different wholesale electricity prices in different zones across Great Britain". Suppliers could manage that risk for customers, but the update says this would result in them "pricing additional risk premia into tariffs".
- Investor risk. The update says zonal pricing "would be likely to create additional risk and uncertainty for investors", which would raise the cost of delivering the investment needed, with short-term impacts for consumers.
- Delivery time. The update assessed that implementing zonal pricing "would take 7 years assuming no delays".
For a business reader the second point matters most. A zonal market could have put a different wholesale price on each region. The decision keeps one.
What does the delivery plan of 21 April 2026 change?
DESNZ published the RNP delivery plan on 21 April 2026. It sets out three groups of reform and, in the same document, a consultation on one of them. The plan says that together they should "reduce system costs and improve efficiency, reduce costly network constraints, and strengthen day-to-day system operation".
| Strand | What it covers | Status in the published plan |
|---|---|---|
| Siting and investment levers | Planning, seabed leasing, network planning and build, the connections process, locational charging "such as the current network charging regime", and government investment support | The consultation closed on 2 June 2026. Government aims to take final decisions later in 2026 on how to combine the levers |
| Constraints management | Network build, smart grid measures and other tools to cut the volume and cost of paying generators to change their output | Each measure follows its own timeline, with further industry engagement in 2026 |
| Balancing and settlement | Five reforms proposed by the National Energy System Operator (NESO), from a lower threshold for taking part in the Balancing Mechanism to shorter imbalance settlement periods | A final decision on the first three is likely from Ofgem in the second half of 2026 |
The siting levers aim to steer where generation and storage are built, guided by the Strategic Spatial Energy Plan (SSEP) that NESO is preparing. The other two strands target the cost of running the system day to day.
Which parts could reach a business bill?
Wholesale price. No change. The plan lists, as a benefit, that "consumers across Great Britain continue to benefit from uniform wholesale market pricing".
Network charges. The plan treats locational charging as one lever for steering investment. Ofgem's call for input, published on 26 March 2026, sets out options for a locational charge, "from incremental refinements of current arrangements through to more transformative approaches", and says "We anticipate delivering reforms by 2029". It also offers "some initial considerations for designing locational charges for demand and storage assets". So whether and how a business's own transmission charge changes is at an early stage. The government's case for reform is partly about stability: the summer update says investors find Transmission Network Use of System (TNUoS) charges "too volatile year-on-year", which it says leads to higher costs for consumers because generators price that uncertainty into their bids.
Balancing and constraint costs. NESO describes the Balancing Services Use of System (BSUoS) charge as recovering "the cost of day-to-day operation including the cost of balancing the electricity transmission system", and since April 2023 it has been recovered solely from final demand. The plan says that in 2024/25 "two-thirds of the cost of network constraints was due to payments to gas and other generators". Its own modelling estimates that, without further action, constraint costs "may peak at around £7 billion in 2030/31", depending on network build. That is the plan's modelling, not a forecast for any site's bill. Reforms that reduce balancing costs are the ones most likely to be felt in BSUoS, but neither the plan nor NESO puts a figure on a business tariff.
Savings estimates. The plan gives an early, indicative household estimate: "a gradual accumulation of savings post-2030, reaching £20-40 on the typical annual dual fuel household bill by 2040". It does not give an equivalent figure for a business.
What is still a proposal?
- Legislation. The plan says the government, "subject to Parliament, intends to legislate for powers to amend industry codes and licences".
- Locational charging. Ofgem describes its call for input as early thinking, with the purpose "to identify a full range of options before further policy development".
- Balancing reforms. NESO's call for input closed on 14 April 2026. At 22 October 2026 the NESO and Ofgem pages checked for this guide did not show a final decision on the five reforms.
- The spatial plan. The plan says "The Secretary of State is due to decide which SSEP Pathway to choose in the autumn of 2026", and that NESO "aims to consult on the draft SSEP in early 2027".
One question has been settled. The plan confirms that "the changes being implemented under the RNP Programme will not include a shift to a deemed CfD model, where payments are based on potential rather than actual output". The Contracts for Difference (CfD) levy is covered in the non-commodity costs guide.
What can a business do while this plays out?
- Read the contract. Ofgem says "Some regulated costs, such as network charges, may still change depending on contract terms". Whether a change reaches the bill depends on that wording.
- Look at flexibility. The plan notes that "households and businesses can shift or increase their electricity use at certain times". The demand side response guide covers how that is rewarded.
- Mark the dates. NESO "publishes the TNUoS tariffs annually by 31 January to take effect from 1 April each year", so each winter brings the next charging year's figures.
The cost guide sets out what on-site equipment costs and how it can be funded, since reducing the units bought from the grid is the part of the bill a business controls directly. Readers who want to look at a particular site can send an enquiry through the form on this page.
Sources and last checked
- Department for Energy Security and Net Zero, Reformed National Pricing (RNP): delivery plan, published 21 April 2026, and its accessible webpage. Checked 22 October 2026.
- Department for Energy Security and Net Zero, Review of electricity market arrangements (REMA): Summer update, 2025, published 10 July 2025, and its accessible webpage. Checked 22 October 2026.
- Ofgem, Locational Charges and Regulatory Siting Levers Under Reformed National Pricing, call for input published 26 March 2026. Checked 22 October 2026.
- NESO, Reformed National Pricing; Balancing Services Use of System (BSUoS) charges; Transmission Network Use of System (TNUoS) charges. Checked 22 October 2026.
- Department for Energy Security and Net Zero, Ofgem and NESO, NESO calls for input on proposed electricity market reforms, published 11 February 2026. Checked 22 October 2026.
- Ofgem, Understand your energy costs if you are not protected by the energy price cap, 28 April 2026. Checked 22 October 2026.
Guides on this topic
Common questions
Is zonal pricing coming back?
The summer update says the government "does not intend to introduce zonal pricing", and the delivery plan lists uniform wholesale pricing across Great Britain as a feature of RNP. Policy can be revisited, but nothing on the pages checked proposes it.
Will RNP lower a business electricity bill?
The plan says the reforms "should reduce system costs" but gives no business-bill figure, and its household estimate runs to 2040. What reaches a bill also depends on the supply contract, so the effect on any one site cannot be read from the plan.
Does RNP change the Contracts for Difference scheme?
Not in the way once considered. The plan confirms there will be no shift to a deemed CfD model, and says it is still considering a capacity-based CfD. The levy that funds CfD payments is one of the policy costs on a bill.
What is the Strategic Spatial Energy Plan?
The plan describes it as a geographical plan for generation and storage. NESO is preparing it, and it feeds into the network plan for the transmission build. It is meant to guide where new investment is steered, not to set a bill.